Marc Isambard Brunel1836
A larger improved shield is assembled so excavation of the Thames Tunnel can resume after the long suspension.
France · Science / Civil Engineering. Chronological records rendered directly from the World History Database.
A larger improved shield is assembled so excavation of the Thames Tunnel can resume after the long suspension.
This factsheet is generated from stored World History Database records matching the country, broad category, detailed category and exact Event value shown above. Duplicate display records are collapsed; database wording is otherwise preserved. Source provenance varies by record, so formal academic citation should be checked against the relevant primary source, archive or specialist historical reference.