Permanent historical factsheet

Box Tunnel

Great Britain · Science / Civil Engineering. Chronological records rendered directly from the World History Database.

5Records
1836–1841Date range
1Named people
1Places

Chronological records

1836

Isambard Kingdom Brunel1836

Box Hill · Science / Civil Engineering

Brunel begins sinking exploratory shafts to examine the geology along the proposed route through Box Hill.

1838

Isambard Kingdom BrunelDecember 1838

Box Hill · Science / Civil Engineering

Work begins on Box Tunnel through Box Hill for the Great Western Railway.

1839

Isambard Kingdom BrunelAugust 1839

Box Hill · Science / Civil Engineering

Difficult rock strata and heavy water ingress delay excavation, with less than half of the tunnel completed.

1841

Isambard Kingdom BrunelApril 1841

Box Hill · Science / Civil Engineering

The opposing tunnel workings meet with an alignment error of less than two inches and construction is completed.

Isambard Kingdom Brunel30 June 1841

Box Hill · Science / Civil Engineering

Box Tunnel opens as the longest railway tunnel in the world at the time.

Names involved

Isambard Kingdom Brunel

Provenance

This factsheet is generated from stored World History Database records matching the country, broad category, detailed category and exact Event value shown above. Duplicate display records are collapsed; database wording is otherwise preserved. Source provenance varies by record, so formal academic citation should be checked against the relevant primary source, archive or specialist historical reference.