Brunel launches a survey cylinder into the River Tamar to investigate foundations for the future bridge.
Great Britain · Science / Engineering. Chronological records rendered directly from the World History Database.
Brunel launches a survey cylinder into the River Tamar to investigate foundations for the future bridge.
Brunel finalises the distinctive lenticular truss design for the railway bridge across the River Tamar.
Construction begins on Brunel's Royal Albert Bridge across the River Tamar between Devon and Cornwall.
The Royal Albert Bridge passes its official Board of Trade inspection and load tests.
Prince Albert formally opens the Royal Albert Bridge, although illness prevents Brunel from attending.
Public railway services begin across the Royal Albert Bridge as the Cornwall Railway opens through Saltash.
This factsheet is generated from stored World History Database records matching the country, broad category, detailed category and exact Event value shown above. Duplicate display records are collapsed; database wording is otherwise preserved. Source provenance varies by record, so formal academic citation should be checked against the relevant primary source, archive or specialist historical reference.