Historical place archive

Aswan Dam in History

Browse historical events and people recorded at Aswan Dam in Russia. The records below are rendered directly from the World History Database into this page's initial HTML.

6 records6 event labels2 people1960–1971

Historical events in Aswan Dam

1960

1960
High Dam Engineering Design
Nikolai Aleksandrovich Malyshev · Civil Engineering

Malyshev leads Soviet design work for the rock-fill dam and hydroelectric complex.

1963

1963
River Diversion Preparations
Nikolai Aleksandrovich Malyshev · Civil Engineering

Malyshev supervises engineering preparations for closing the river's original channel.

1964

1964
Completion of First Construction Stage
Nikolai Aleksandrovich Malyshev · Civil Engineering

Malyshev's design team completes the stage permitting Nile diversion and initial impoundment.

1966

1966
Power Station Installation
Nikolai Aleksandrovich Malyshev · Hydroelectric Engineering

Malyshev's project teams install generating units and water conduits for hydroelectric production.

1967

1967
First Turbine Commissioning
Nikolai Aleksandrovich Malyshev · Hydroelectric Engineering

Soviet-assisted engineers commission the first generating units at the High Dam power station.

1971

15 January 1971
Soviet Participation in Inauguration
Nikolai Viktorovich Podgorny · Government of Russia

Podgorny joins Sadat at the ceremony celebrating Soviet-Egyptian construction cooperation.

Provenance

About these place records

These entries are generated from stored World History Database records whose country and place fields match Russia and Aswan Dam. Names, dates, event labels and descriptions are reviewed and normalised as the database develops. Historical place names may not match modern administrative boundaries.

This database is a research index. For formal scholarly citation, verify individual claims against appropriate primary, archival, academic or specialist sources.