Hungerford River Span Surveyed
Brunel assessed the Thames crossing and the foundation requirements for the proposed suspension structure.
Great Britain · Science / Civil Engineering. Chronological records from PostgreSQL.
Brunel assessed the Thames crossing and the foundation requirements for the proposed suspension structure.
This factsheet contains records exported from PostgreSQL public.historical_events. Duplicate display records have been collapsed. Stored wording is otherwise presented without historical claims added by the generator. For academic citation, verify records against appropriate primary or specialist sources.