Benjamin Baker Biography and Timeline

Follow Benjamin Baker through 5 dated historical records for Great Britain.

Benjamin Baker, historical timeline

A chronological timeline drawn from matching World History Database records.

5Distinct records
1 of 1Page
1898–1902Years on this page

1898

Aswan Low Dam Engineering

Consulting Engineer · Aswan Dam · Science / Civil Engineering

Baker provides senior engineering leadership for construction of the masonry dam.

Masonry Dam Structural Planning Advanced

Consulting Engineer · Aswan Dam · Science / Civil Engineering

Benjamin Baker provided senior engineering input for the masonry barrage and its supporting works.

1901

Aswan Dam Sluice System Engineered

Consulting Engineer · Aswan Dam · Science / Civil Engineering

The original dam incorporated sluices intended to regulate river flow and sediment passage through the structure.

1902

Completion of Masonry Dam

Consulting Engineer · Aswan Dam · Science / Civil Engineering

Baker's engineering work culminates in completion of the original masonry structure.

First Reservoir Structure Finished

Consulting Engineer · Aswan Dam · Science / Civil Engineering

The original Aswan Low Dam was completed as a major masonry water storage structure on the Nile.

Records, sources and methodology

These dates and descriptions come from the historical_events database. Exact duplicate records have been collapsed. Names are grouped by the country, Name 2 and Name 1 fields; records with missing Name 2 cannot be reliably assigned to an individual biography. Check the underlying sources before formal citation.