Barlow Backs Bridge Memorial Campaign
William Henry Barlow helps revive interest in finishing the Clifton Suspension Bridge as a memorial to Brunel after the engineer dies in September 1859.
Follow William Henry Barlow through 19 dated historical records for Great Britain.
A chronological timeline drawn from matching World History Database records.
William Henry Barlow helps revive interest in finishing the Clifton Suspension Bridge as a memorial to Brunel after the engineer dies in September 1859.
Barlow helped adapt the earlier design to enable the unfinished suspension bridge to be completed.
The revived design incorporated an additional chain on each side to provide greater strength than Brunel originally envisaged.
Barlow's revised Clifton design made use of the iron suspension links recovered from the demolished Thames bridge.
Iron chain links salvaged from the London bridge were transported for reuse in the Clifton crossing.
Engineers reused surviving Hungerford suspension links in the structure rising across the Avon Gorge.
William Henry Barlow helps revise Brunel's bridge plans to provide a wider and higher roadway suited to the completion scheme advanced in the 1860s.
The revised Clifton bridge design associated with Barlow omits Brunel's proposed Egyptian inspired iron tower cladding, leaving the monumental masonry visible.
Construction crews developed the roadway and iron suspension structure spanning the Avon Gorge.
Workers suspend a narrow planked platform over the Avon Gorge from temporary cables, allowing them to assemble the chains that will ultimately carry the roadway.
The Clifton Suspension Bridge opens to the public.
Role range: 1862-1864
The bridge finally opened in December following completion of the revised design by Barlow and Hawkshaw.
The completed Clifton Suspension Bridge used salvaged chains from Brunel's former London crossing.
On 8 May 1864 workers secure the final link among approximately four thousand two hundred suspension links, completing the bridge's principal supporting chains.
On 2 July 1864 the last main cross girder is installed, completing the structural framework on which the Clifton bridge roadway is subsequently laid.
At a meeting on 3 November 1864 the Clifton bridge directors determine that the formal opening will take place on 8 December after earlier dates prove impractical.
Engineers test the completed Clifton suspension structure under approximately five hundred tons of stone and find its resulting deflection within acceptable limits.
The completion works include cutting and finishing an approach road on the Clifton side, linking the new suspension bridge with the surrounding road network.
On 8 December 1864 the inauguration of the Clifton bridge draws a vast crowd to Bristol as military units and local trades process through the city.
These dates and descriptions come from the historical_events database. Exact duplicate records have been collapsed. Names are grouped by the country, Name 2 and Name 1 fields; records with missing Name 2 cannot be reliably assigned to an individual biography. Check the underlying sources before formal citation.