John Hawkshaw Biography and Timeline

Follow John Hawkshaw through 22 dated historical records for Great Britain.

John Hawkshaw, historical timeline

A chronological timeline drawn from matching World History Database records.

22Distinct records
1 of 1Page
1858–1864Years on this page

1858

Battersea Thames Rail Crossing Develops

Battersea · Science / Civil Engineering

Victorian railway engineering added Thames crossings that strengthened links between Battersea and central London.

1859

Hawkshaw Supports Brunel Memorial Completion

Bristol · Science / Civil Engineering

Following Brunel's death, John Hawkshaw joins engineering colleagues who promote completion of the unfinished Clifton crossing as a lasting tribute to its designer.

1860

Engineers Propose Clifton Memorial Bridge

Clifton Bridge · Science / Civil Engineering

Civil engineers backed completing Brunel's unfinished crossing as a memorial to the late designer.

Hungerford Chain Reuse Approved

Clifton Bridge · Science / Civil Engineering

Engineers decided that suspension chains from the demolished Hungerford Bridge could be reused at Clifton.

Hungerford Iron Chains Purchased For Clifton

Hungerford · Science / Civil Engineering

Salvaged chains from the demolished Hungerford Bridge were acquired for Brunel's unfinished Clifton crossing.

1861

Bridge Company Established For Completion

Bristol · Science / Civil Engineering

John Hawkshaw helps establish the organisation charged with finishing the abandoned Clifton Suspension Bridge and raising the resources required for renewed building.

1862

Clifton Bridge Restarted

Engineer · Bristol · Science / Civil Engineering

Hawkshaw helps restart work on the Clifton Suspension Bridge.

Role range: 1862-1864

Clifton Bridge Construction Restarts

Clifton Bridge · Science / Civil Engineering

Work resumed to complete the suspended roadway and its supporting structures under revised engineering arrangements.

Hungerford Chains Transported To Bristol

Hungerford · Science / Civil Engineering

Large iron suspension chain links travelled from London to Bristol for incorporation into the Clifton Bridge.

Hawkshaw Specifies Triple Suspension Chains

Bristol · Science / Civil Engineering

John Hawkshaw's revised completion design provides three chains on either side of the bridge in place of the two chain arrangement in Brunel's earlier scheme.

1863

Battersea Railway Bridges Improve Connections

Battersea · Science / Civil Engineering

Additional railway bridge works helped connect south London lines with terminals north of the Thames.

Nine Temporary Gorge Cables Installed

Avon Gorge · Science / Civil Engineering

During the summer of 1863 the bridge builders stretch nine substantial cables between the towers to support working platforms, transport equipment and chain installation.

Chain Transport Traveller Runs Across Gorge

Avon Gorge · Science / Civil Engineering

The Clifton construction team uses a wheeled travelling apparatus running along temporary cables to move heavy suspension links into place above the river.

1864

Clifton Bridge Completion

Engineer · Bristol · Science / Civil Engineering

Hawkshaw helps complete Brunel's Clifton bridge design.

Role range: 1862-1864

Clifton Final Engineering Inspections Conducted

Clifton Bridge · Science / Civil Engineering

The completed structure underwent preparation and inspection before the suspension bridge opened to public traffic.

Suspension Rod Installation Under Way

Bristol · Science / Civil Engineering

On 17 May 1864 engineers are fitting the vertical suspension rods and girders, transferring the design from completed chains toward a load bearing road deck.

Construction Traveller Carries Engineers Across

Bristol · Science / Civil Engineering

After the final girder is set on 2 July 1864, bridge engineers cross the unfinished span in the movable construction traveller while spectators watch from the gorge.

British Association Delegates Inspect Crossing

Bristol · Science / Civil Engineering

On 22 September 1864 John Hawkshaw helps show the nearly completed Clifton bridge to visiting members of the British Association for the Advancement of Science.

Quarried Stone Spread For Loading Test

Bristol · Science / Civil Engineering

In early November 1864 workers distribute stone across the Clifton bridge roadway, preparing the newly constructed span for a substantial proof load test.

Bridge Ironwork Receives Protective Painting

Bristol · Science / Civil Engineering

As final preparations continue in November 1864, the bridge ironwork is painted a chocolate brown colour to protect and finish the new suspension structure.

Trade Societies Organise Opening Procession

Bristol · Science / Civil Engineering

Bristol trade and friendly societies arrange a large civic procession to celebrate the completed suspension crossing during the December opening ceremonies.

Bridge Illuminated With Magnesium Flares

Bristol · Science / Civil Engineering

The Clifton bridge is illuminated for its December 1864 inauguration with contemporary lighting techniques including limelight and magnesium flares, although strong wind disrupts the display.

Records, sources and methodology

These dates and descriptions come from the historical_events database. Exact duplicate records have been collapsed. Names are grouped by the country, Name 2 and Name 1 fields; records with missing Name 2 cannot be reliably assigned to an individual biography. Check the underlying sources before formal citation.