Battersea Thames Rail Crossing Develops
Victorian railway engineering added Thames crossings that strengthened links between Battersea and central London.
Follow John Hawkshaw through 22 dated historical records for Great Britain.
A chronological timeline drawn from matching World History Database records.
Victorian railway engineering added Thames crossings that strengthened links between Battersea and central London.
Following Brunel's death, John Hawkshaw joins engineering colleagues who promote completion of the unfinished Clifton crossing as a lasting tribute to its designer.
Civil engineers backed completing Brunel's unfinished crossing as a memorial to the late designer.
Engineers decided that suspension chains from the demolished Hungerford Bridge could be reused at Clifton.
Salvaged chains from the demolished Hungerford Bridge were acquired for Brunel's unfinished Clifton crossing.
John Hawkshaw helps establish the organisation charged with finishing the abandoned Clifton Suspension Bridge and raising the resources required for renewed building.
Hawkshaw helps restart work on the Clifton Suspension Bridge.
Role range: 1862-1864
Work resumed to complete the suspended roadway and its supporting structures under revised engineering arrangements.
Large iron suspension chain links travelled from London to Bristol for incorporation into the Clifton Bridge.
John Hawkshaw's revised completion design provides three chains on either side of the bridge in place of the two chain arrangement in Brunel's earlier scheme.
Additional railway bridge works helped connect south London lines with terminals north of the Thames.
During the summer of 1863 the bridge builders stretch nine substantial cables between the towers to support working platforms, transport equipment and chain installation.
The Clifton construction team uses a wheeled travelling apparatus running along temporary cables to move heavy suspension links into place above the river.
Hawkshaw helps complete Brunel's Clifton bridge design.
Role range: 1862-1864
The completed structure underwent preparation and inspection before the suspension bridge opened to public traffic.
On 17 May 1864 engineers are fitting the vertical suspension rods and girders, transferring the design from completed chains toward a load bearing road deck.
After the final girder is set on 2 July 1864, bridge engineers cross the unfinished span in the movable construction traveller while spectators watch from the gorge.
On 22 September 1864 John Hawkshaw helps show the nearly completed Clifton bridge to visiting members of the British Association for the Advancement of Science.
In early November 1864 workers distribute stone across the Clifton bridge roadway, preparing the newly constructed span for a substantial proof load test.
As final preparations continue in November 1864, the bridge ironwork is painted a chocolate brown colour to protect and finish the new suspension structure.
Bristol trade and friendly societies arrange a large civic procession to celebrate the completed suspension crossing during the December opening ceremonies.
The Clifton bridge is illuminated for its December 1864 inauguration with contemporary lighting techniques including limelight and magnesium flares, although strong wind disrupts the display.
These dates and descriptions come from the historical_events database. Exact duplicate records have been collapsed. Names are grouped by the country, Name 2 and Name 1 fields; records with missing Name 2 cannot be reliably assigned to an individual biography. Check the underlying sources before formal citation.