First Heightening Completed
MacDonald oversees completion of the first major raising of the Aswan Low Dam.
Follow Murdoch MacDonald through 5 dated historical records for Great Britain.
A chronological timeline drawn from matching World History Database records.
MacDonald oversees completion of the first major raising of the Aswan Low Dam.
Murdoch MacDonald's engineering organization completed the first major raising of the original Aswan dam.
Engineers undertook a second heightening of the original Aswan dam to increase the water retained behind it.
MacDonald's engineering organisation completes a second enlargement of the reservoir dam.
Work on the second enlargement of the original Aswan Low Dam was completed.
These dates and descriptions come from the historical_events database. Exact duplicate records have been collapsed. Names are grouped by the country, Name 2 and Name 1 fields; records with missing Name 2 cannot be reliably assigned to an individual biography. Check the underlying sources before formal citation.