Charing Cross Rail Approach Planned
Railway schemes proposed a new crossing near Hungerford to carry trains toward a central London terminus.
Follow South Eastern Railway through 4 dated historical records for Great Britain.
A chronological timeline drawn from matching World History Database records.
Railway schemes proposed a new crossing near Hungerford to carry trains toward a central London terminus.
The pedestrian bridge was removed to enable construction of the Charing Cross railway crossing.
The replacement Thames bridge carried railway trains toward the new Charing Cross terminus.
The railway bridge formed an important approach for trains entering Charing Cross station.
These dates and descriptions come from the historical_events database. Exact duplicate records have been collapsed. Names are grouped by the country, Name 2 and Name 1 fields; records with missing Name 2 cannot be reliably assigned to an individual biography. Check the underlying sources before formal citation.