Malyshev leads Soviet design work for the rock-fill dam and hydroelectric complex.
Historical person
Nikolai Aleksandrovich Malyshev Biography
Historical biography and chronological timeline for Nikolai Aleksandrovich Malyshev, based on 5 World History Database records associated with Russia.
Chronological biography
1960
1963
Malyshev supervises engineering preparations for closing the river's original channel.
1964
Malyshev's design team completes the stage permitting Nile diversion and initial impoundment.
1966
Malyshev's project teams install generating units and water conduits for hydroelectric production.
1967
Soviet-assisted engineers commission the first generating units at the High Dam power station.
Titles and roles
Chief Design Engineer
Record provenance
This biography is assembled from World History Database records filtered by country and personal-name fields. Exact duplicate display records are removed. The database is an index rather than a complete narrative biography; formal research should verify entries against relevant primary or specialist sources.