High Dam Engineering Design
Malyshev leads Soviet design work for the rock-fill dam and hydroelectric complex.
Follow Nikolai Aleksandrovich Malyshev through 5 dated historical records for Russia.
A chronological timeline drawn from matching World History Database records.
Malyshev leads Soviet design work for the rock-fill dam and hydroelectric complex.
Malyshev supervises engineering preparations for closing the river's original channel.
Malyshev's design team completes the stage permitting Nile diversion and initial impoundment.
Malyshev's project teams install generating units and water conduits for hydroelectric production.
Soviet-assisted engineers commission the first generating units at the High Dam power station.
These dates and descriptions come from the historical_events database. Exact duplicate records have been collapsed. Names are grouped by the country, Name 2 and Name 1 fields; records with missing Name 2 cannot be reliably assigned to an individual biography. Check the underlying sources before formal citation.