Historical biography archive · Updated 2026-11-03

George Washington Goethals Biography and Timeline

Follow George Washington Goethals through 3 dated historical records for United States of America.

George Washington Goethals, historical timeline

A chronological timeline drawn from matching World History Database records.

3Distinct records
1 of 1Page
1907–1914Years on this page

1907

Panama Canal Leadership

Chief Engineer · Panama Canal · Economy / Goethals Canal Leadership

Goethals assumes command as chief engineer and chairman of the Isthmian Canal Commission.

Role range: 1907-1914

1908

Gatun Dam and Locks

Chief Engineer · Gatun · Economy / Gatun Dam and Locks

Goethals oversees construction of Gatun Dam, Gatun Lake and the Atlantic lock system.

Role range: 1907-1914

1914

Opening of Panama Canal

Chief Engineer · Panama Canal · Economy / Panama Canal

The steamship Ancon makes the canal's official inaugural transit.

Role range: 1907-1914

Records, sources and methodology

These dates and descriptions come from the historical_events database. Exact duplicate records have been collapsed. Names are grouped by the country, Name 2 and Name 1 fields; records with missing Name 2 cannot be reliably assigned to an individual biography. Check the underlying sources before formal citation.