Avon Gorge Bridge Design
Enters the competition while still a young independent engineer.
Brunel engineering · permanent subject timeline
Brunel's celebrated bridge design across the Avon Gorge. This page combines historical context with 18 matching records drawn directly from the World History Database Brunel chronology.
Historical context
Isambard Kingdom Brunel won the competition to design a suspension bridge across the Avon Gorge at Clifton. Construction began in 1831 but financial difficulties delayed completion until after Brunel's death.
The bridge became one of the most recognizable works associated with Brunel. Its long gestation illustrates the financial and organizational difficulties of major infrastructure as well as the ambition of nineteenth-century bridge engineering.
World History Database records
The records below are selected from the 361-record Brunel chronology and are rendered as static HTML in chronological order.
Avon Gorge Bridge Design
Enters the competition while still a young independent engineer.
Clifton Suspension Bridge
Brunel submits designs to the competition for a suspension bridge across the Avon Gorge at Clifton.
First Clifton Bridge Competition
Submits designs to the first Clifton Suspension Bridge competition.
Second Clifton Suspension Bridge Competition
Submits revised designs in the second competition for a bridge across the Avon Gorge.
Clifton Bridge Engineer Appointed
Brunel is appointed engineer for the Clifton Suspension Bridge after his revised design is selected.
Clifton Suspension Bridge
A ceremony marks the start of construction and work begins on the Clifton side of the gorge.
Clifton Suspension Bridge
Construction is halted after the Bristol riots damage confidence and stop subscriptions to the bridge company.
Clifton Suspension Bridge
Brunel secures acceptance of his revised suspension bridge design and becomes project engineer.
Construction
Work begins on the Clifton Suspension Bridge, one of Brunel's earliest major independent projects.
Clifton Suspension Bridge
Construction resumes after renewed commercial confidence brings further investment to the project.
Clifton Suspension Bridge
The main contractors fail financially, but the bridge towers are raised in unfinished stone.
Clifton Suspension Bridge
Funds are exhausted and construction stops before the chains and roadway can be completed.
Hungerford Bridge Completed
Its chains are later reused to complete the Clifton Suspension Bridge.
Clifton Bridge Works Abandoned
Construction of the Clifton Suspension Bridge is completely abandoned.
Clifton Suspension Bridge
Chains from Brunel's dismantled Hungerford Suspension Bridge are purchased for use in completing the Clifton bridge.
Clifton Suspension Bridge
Construction restarts under a revised design by William Henry Barlow and John Hawkshaw.
Clifton Suspension Bridge
The Clifton Suspension Bridge opens to the public as a memorial to Brunel five years after his death.
Clifton Suspension Bridge
The completed structure is tested by placing about five hundred tons of stone across the bridge deck.
Editorial provenance
Compiled and edited by World History Database
Historical context is editorial material; the chronology is generated from World History Database Brunel records.
Last reviewed: September 2026.