Complete Brunel chronology: all 721 records

Complete, unfiltered historical archive of all 721 supplied entries; no keyword-based exclusion.

Robert Howlett portrait of Isambard Kingdom Brunel, 1857
Robert Howlett portrait of Isambard Kingdom Brunel, 1857 — Image: Wikimedia Commons source and licence

Historical chronology

All 721 records from the replacement source dataset, including overlapping topics and people.

Search all Brunel chronology records

1753 — Vick Bequeaths Funds For Avon Gorge Crossing

Bristol merchant William Vick leaves one thousand pounds in his will to finance a future crossing of the Avon Gorge, establishing the bequest from which the Clifton bridge project eventually develops.

Vick, William · Bristol
1769, April 25 — Birth of Marc Isambard Brunel

Marc Isambard Brunel is born at Hacqueville in Normandy to Jean Charles Brunel and Marie-Victoire Lefebvre.

Brunel, Marc Isambard · Hacqueville
1780 — Carpentry

Brunel studies carpentry and develops practical skill while also showing ability in drawing and mathematics.

Brunel, Marc Isambard · Rouen
1780 — Education

Brunel is sent to a seminary in Rouen for a classical education intended to prepare him for the priesthood.

Brunel, Marc Isambard · Rouen
1786 — French Navy

Brunel enters the French Navy as a cadet after receiving instruction in naval subjects.

Brunel, Marc Isambard · France
1786 — Navigation

During naval voyages to the West Indies Brunel gains experience of ships, navigation and marine construction.

Brunel, Marc Isambard · West Indies
1792 — Sophia Kingdom

Brunel meets Sophia Kingdom, an English governess living in France, before revolutionary danger separates them.

Brunel, Marc Isambard · Rouen
1792, January — French Navy

Brunel's naval service ends when his frigate pays off its crew and he returns to Normandy.

Brunel, Marc Isambard · Rouen
1793 — Emigration

Brunel flees revolutionary France and sails from Le Havre for the United States aboard the Liberty.

Brunel, Marc Isambard · Le Havre
1793 — Castorland Survey

Joins a survey of French-owned land near Lake Ontario.

Brunel, Marc Isambard · Lake Ontario
1793 — Lake Ontario Land Survey

Begins professional surveying work soon after reaching North America.

Brunel, Marc Isambard · Lake Ontario
1794 — American Inland Navigation Feasibility Examined

Brunel investigated routes that could integrate waterways and improve connections between inland trade and New York. It helped establish the city as a centre of technical research.

Brunel, Marc Isambard · New York
1794 — Hudson Champlain Canal Route Survey

Marc Brunel surveyed a proposed canal joining the Hudson River to Lake Champlain after moving to the United States. The work created a practical link between experimentation and infrastructure.

Brunel, Marc Isambard · New York
1794 — Canal Route Survey

His engineering ability brings increasing responsibility on the canal project.

Brunel, Marc Isambard · New York
1794 — Hudson-Lake Champlain Canal Survey

Surveys a proposed canal linking the Hudson River and Lake Champlain.

Brunel, Marc Isambard · New York
1795 — Brunel Undertakes New York Engineering Duties

Brunel gained engineering responsibilities in New York while developing his surveying and mechanical interests. The advance provided methods later adopted by other engineers.

Brunel, Marc Isambard · New York
1795 — Chief Engineer of New York

Becomes chief engineer of New York while still in his twenties.

Brunel, Marc Isambard · New York
1795 — New York Engineering Appointment

Takes responsibility for major civic and defence engineering work.

Brunel, Marc Isambard · New York
1796 — Artillery Foundry Machinery Designed

Brunel developed equipment intended to improve the casting and boring of cannon in New York. Its practical implications extended beyond the initial application.

Brunel, Marc Isambard · New York
1796 — Harbour Fortifications Receive Engineering Plans

Brunel worked on plans to strengthen defences protecting approaches to New York harbour. Its significance included improved measurement or operational reliability.

Brunel, Marc Isambard · New York
1796 — Long Island Maritime Approaches Surveyed

Brunel considered strategic access near Long Island when planning protective works for the port. The project changed the techniques available to later investigators.

Brunel, Marc Isambard · New York
1796 — Staten Island Channel Defences Studied

Brunel assessed vulnerable waterways near Staten Island as part of his harbour defence work. It demonstrated how scientific ideas became workable apparatus.

Brunel, Marc Isambard · New York
1796 — Cannon Foundry Machinery

Introduces machinery for casting and boring artillery.

Brunel, Marc Isambard · New York
1796 — Narrows Defence Plans

Applies engineering experience to strengthening New York harbour defences.

Brunel, Marc Isambard · New York Harbour
1796 — New York Harbour Defences

Prepares defence plans for channels around Staten Island and Long Island.

Brunel, Marc Isambard · New York Harbour
1799 — Admiralty Block Machinery Proposal

Brunel presents the Admiralty with his proposal to mechanise the production of ships' pulley blocks for the Royal Navy.

Brunel, Marc Isambard · London
1799 — Block Machinery Models Developed with Maudslay

Brunel works with Henry Maudslay on precision models and machine components needed for his naval block-making system.

Brunel, Marc Isambard · London
1799 — Henry Maudslay

Brunel works with Henry Maudslay to produce models and machinery for the manufacture of ships' pulley blocks.

Brunel, Marc Isambard · London
1799, March 7 — Arrival

Brunel lands at Falmouth and travels to London to pursue his engineering proposals.

Brunel, Marc Isambard · Falmouth
1799, May — Mechanical Drawing Patent

Continues developing mechanical inventions after arriving in Britain.

Brunel, Marc Isambard · London
1799, May — Writing and Drawing Machine Patent

Takes out a British patent for a writing and drawing machine.

Brunel, Marc Isambard · London
1799, November 1 — Marriage

Brunel marries Sophia Kingdom after the couple are reunited in London.

Brunel, Marc Isambard · St Andrew Holborn
1801 — Sequential Block Production System Designed

Brunel develops a linked sequence of specialised machines so pulley blocks can be produced repeatedly to standard dimensions.

Brunel, Marc Isambard · London
1801 — Block-making Patent

Brunel obtains a patent covering machinery for manufacturing ships' pulley blocks.

Brunel, Marc Isambard · London
1802 — Brunel Submits Mechanised Block Making Scheme

Brunel proposed a system for manufacturing rigging blocks using specialised machine tools. The installation demonstrates the adaptation of existing dock infrastructure.

Brunel, Marc Isambard · Portsmouth
1802 — Portsmouth Machinery Installation Recommended

Samuel Bentham supports installing Brunel's block machinery at Portsmouth Dockyard, moving the system toward large-scale naval use.

Brunel, Marc Isambard · Portsmouth
1802, April — Portsmouth Block Mills

Samuel Bentham recommends installation of Brunel's block-making machinery at Portsmouth Dockyard.

Brunel, Marc Isambard · Portsmouth
1803 — Block Shell Timber Blanks Prepared Mechanically

Powered sawing equipment produced wooden blanks for the cases of naval pulley blocks. The design reduced manual operations between manufacturing stages.

Brunel, Marc Isambard · Portsmouth
1803 — Integrated Block Making Sequence Organised

The machinery was arranged to move workpieces between successive operations with reduced manual handling. The machinery required unusually accurate metalworking and maintenance.

Brunel, Marc Isambard · Portsmouth
1803 — Block Mill Sawing Operations Mechanised

Brunel's machinery mechanises the sawing and preparation of timber blanks used to make Royal Navy pulley blocks.

Brunel, Marc Isambard · Portsmouth
1803, January — Portsmouth Block Mills

The first series of Brunel's machines is installed to manufacture medium-sized pulley blocks.

Brunel, Marc Isambard · Portsmouth
1803, May — Portsmouth Block Mills

A second series of Brunel's machines is installed to manufacture smaller pulley blocks.

Brunel, Marc Isambard · Portsmouth
1804 — Mortising Machines Cut Block Openings

Specially designed machines formed repeated openings and slots in block shells with consistent geometry. It provided an early model for integrated industrial manufacture.

Brunel, Marc Isambard · Portsmouth
1804 — Block Mill Mortising Operations Mechanised

Specialised machinery cuts repeated mortises and openings in block components with greater consistency than hand production.

Brunel, Marc Isambard · Portsmouth
1805 — Large Pulley Block Machines Installed

A third series completed much of the mechanised equipment needed for larger ships' rigging blocks. The process reduced dependence on traditional individually shaped components.

Brunel, Marc Isambard · Portsmouth
1805 — Block Mill Shaping Operations Mechanised

Brunel's Portsmouth system shapes pulley-block shells by machine as part of an integrated production sequence.

Brunel, Marc Isambard · Portsmouth
1805, March — Portsmouth Block Mills

A third series of machines for large pulley blocks completes the main block-making installation.

Brunel, Marc Isambard · Portsmouth
1806, April 9 — Birth of Isambard Kingdom Brunel

Isambard Kingdom Brunel is born in Portsea, Portsmouth, the son of engineer Marc Isambard Brunel and Sophia Kingdom.

Brunel, Isambard Kingdom · Portsea
1806, April 9 — Birth of Isambard Kingdom Brunel

Brunel's son Isambard Kingdom Brunel is born and later becomes a leading civil and mechanical engineer.

Brunel, Marc Isambard · Portsea
1807, September — Portsmouth Block Mills

The block-making plant is judged capable of meeting the Royal Navy's full requirement for pulley blocks.

Brunel, Marc Isambard · Portsmouth
1808 — Portsmouth Makes Thousands Of Naval Blocks

The mechanised installation produced roughly one hundred and thirty thousand rigging blocks within the year. The installation demonstrates the adaptation of existing dock infrastructure.

Brunel, Marc Isambard · Portsmouth
1808 — Portsmouth Labour Saving Demonstrated

The block-making system demonstrates that a small mechanised workforce can replace much larger numbers of skilled manual workers.

Brunel, Marc Isambard · Portsmouth
1808 — Mass Production

The Portsmouth Block Mills produce about one hundred and thirty thousand pulley blocks using Brunel's mechanised system.

Brunel, Marc Isambard · Portsmouth
1810 — Army Boot Machinery

Develops mass-production equipment for footwear during the Napoleonic Wars.

Brunel, Marc Isambard · London
1810 — Army Boot Production

Uses mechanised methods to produce large quantities of military footwear.

Brunel, Marc Isambard · Great Britain
1810 — Boot-Making Machine Patent

Patents machinery intended to mechanise the manufacture of boots.

Brunel, Marc Isambard · London
1810 — Mechanised Footwear Manufacture

Army demand supports Brunel's boot-manufacturing enterprise.

Brunel, Marc Isambard · Great Britain
1810 — Admiralty Payment

The Admiralty agrees a substantial payment to Brunel for the savings created by his block-making machinery.

Brunel, Marc Isambard · London
1811 — Steam Sawmill

Brunel recommends installing a steam-powered sawmill at Chatham Dockyard to replace manual saw-pit labour.

Brunel, Marc Isambard · Chatham Dockyard
1811 — Battersea Timber Works Established

Marc Brunel developed industrial woodworking operations at Battersea using machinery intended to reduce the labour needed for timber preparation.

Brunel, Marc Isambard · Battersea
1812 — Battersea Sawmill

Brunel operates a mechanised sawmill at Battersea designed to cut timber and manufacture veneers.

Brunel, Marc Isambard · Battersea
1812 — Battersea Mechanised Sawmill Operates

Brunel operated powered saws at Battersea to produce sawn timber more efficiently than traditional hand methods.

Brunel, Marc Isambard · Battersea
1812 — Battersea Veneer Cutting Developed

The Battersea works processed thin veneers as part of Brunel's programme of mechanising woodworking.

Brunel, Marc Isambard · Battersea
1813 — Timber Processing Machinery Refined

Brunel refined powered woodworking processes as his Battersea sawmill attempted to serve commercial customers.

Brunel, Marc Isambard · Battersea
1814 — Education

By the age of eight Brunel has learned Euclidean geometry and shows strong ability in mathematics and mechanics.

Brunel, Isambard Kingdom · Chelsea
1814 — River Neva Tunnel

Brunel proposes a tunnel beneath the River Neva at Saint Petersburg and continues developing protected tunnelling methods.

Brunel, Marc Isambard · London
1814 — Royal Society

Brunel is elected a Fellow of the Royal Society in recognition of his engineering achievements.

Brunel, Marc Isambard · London
1814 — Battersea Fire Destroys Machinery

A serious fire devastated the mechanised sawmill and placed Brunel under additional financial pressure.

Brunel, Marc Isambard · Battersea
1814, March 24 — Royal Society Fellowship Election

Brunel is elected a Fellow of the Royal Society in recognition of his mechanical and civil engineering achievements.

Brunel, Marc Isambard · London
1814, August — Battersea Sawmill

Brunel's mechanised sawmill is destroyed by fire, contributing to his later financial difficulties.

Brunel, Marc Isambard · Battersea
1815 — Battersea Factory Reconstruction Planned

Brunel pursued the rebuilding of the machinery and industrial premises damaged by fire.

Brunel, Marc Isambard · Battersea
1816 — Battersea Sawmill

The Battersea sawmill is rebuilt and Brunel resumes work on mechanised timber processing.

Brunel, Marc Isambard · Battersea
1816 — Battersea Rebuilt Sawmill Resumes

Timber processing resumed at Battersea after restoration of the mechanised works.

Brunel, Marc Isambard · Battersea
1816 — Brunel Restores Industrial Veneer Production

The restored Battersea works again used machinery to prepare timber and decorative veneers.

Brunel, Marc Isambard · Battersea
1817 — Battersea Industrial Business Faces Difficulties

Despite technical innovation Brunel's woodworking enterprise continued to face serious commercial and financial problems.

Brunel, Marc Isambard · Battersea
1818, January 20 — Shield Compartment Principle Patented

Brunel patents a tunnelling shield divided into protected working compartments, allowing excavation and brick lining to advance together.

Brunel, Marc Isambard · London
1818, January 20 — Tunnelling Shield

Brunel patents a tunnelling shield that allows miners to excavate in protected compartments while brickwork is built behind them.

Brunel, Marc Isambard · London
1819 — Battersea Engineering Experience Shapes Career

Brunel's mechanised timber work at Battersea formed part of his broader career designing labour saving industrial equipment.

Brunel, Marc Isambard · Battersea
1820 — Education

At the age of fourteen Brunel begins advanced studies at the Henri Quatre college in Caen.

Brunel, Isambard Kingdom · Caen
1820 — Mechanical Drawing

Brunel develops advanced mathematical and drawing skills during his education in France.

Brunel, Isambard Kingdom · Caen
1821 — French Education

Brunel continues technical studies in Paris before entering practical engineering work.

Brunel, Isambard Kingdom · Paris
1821, May — Debt

Financial losses and unpaid obligations lead to Brunel's imprisonment for debt in the King's Bench Prison.

Brunel, Marc Isambard · King's Bench Prison
1821, August — Release

The government grants money to clear Brunel's debts after concern that he may leave Britain to work in Russia.

Brunel, Marc Isambard · King's Bench Prison
1822 — Apprenticeship

Brunel studies precision engineering and horology under the celebrated clockmaker Abraham-Louis Breguet.

Brunel, Isambard Kingdom · Paris
1822 — Breguet Workshop

Brunel gains precision engineering experience in Abraham-Louis Breguet's workshop.

Brunel, Isambard Kingdom · Paris
1822 — Education

Brunel continues his mathematical education at the Lycee Henri-IV in Paris.

Brunel, Isambard Kingdom · Paris
1822 — Engineering Education

Brunel is ruled ineligible for admission to the Ecole Polytechnique because he is a foreign national.

Brunel, Isambard Kingdom · Paris
1822, August — Return to England

Brunel completes his education in France and returns to England to begin his engineering career.

Brunel, Isambard Kingdom · London
1823 — Engineering Assistant

Brunel becomes an assistant to his father and gains practical experience on a range of engineering proposals.

Brunel, Isambard Kingdom · London
1823 — Gas Engine

Brunel and his father experiment with a high-pressure gas engine as an alternative to conventional steam power.

Brunel, Isambard Kingdom · London
1823 — Thames Tunnel

Brunel prepares a plan for a tunnel between Rotherhithe and Wapping using his patented tunnelling shield.

Brunel, Marc Isambard · Rotherhithe
1824 — Thames Crossing Investors Mobilised

Brunel secures financial and political support for a tunnel between Rotherhithe and Wapping using his shield method.

Brunel, Marc Isambard · London
1824 — Tunnel Shield

Brunel works with his father on the shield system used for the Thames Tunnel.

Brunel, Isambard Kingdom · Rotherhithe
1824, February 19 — Thames Tunnel Company

The proposed Thames Tunnel Company is announced after Brunel presents his scheme to supporters and investors.

Brunel, Marc Isambard · London
1824, June — Thames Tunnel Company

Parliament incorporates the Thames Tunnel Company and authorises construction of the river crossing.

Brunel, Marc Isambard · London
1824, July — Thames Tunnel

Brunel joins the Thames Tunnel project after his father is appointed engineer for the crossing beneath the River Thames.

Brunel, Isambard Kingdom · Rotherhithe
1825 — Rotherhithe Shaft Sinking Method Applied

A large brick shaft is constructed and sunk under its own weight to create the working access for the Thames Tunnel.

Brunel, Marc Isambard · Rotherhithe
1825 — Thirty-Six Shield Cells Put into Use

Brunel's shield divides the excavation face into thirty-six protected cells so miners can work while masonry is built immediately behind them.

Brunel, Marc Isambard · Rotherhithe
1825 — Assistant Engineer

Brunel serves as assistant engineer under resident engineer John Armstrong during the early tunnel works.

Brunel, Isambard Kingdom · Rotherhithe
1825, March 2 — Thames Tunnel

Construction of the Thames Tunnel begins ceremonially and Brunel lays the second brick after his father.

Brunel, Isambard Kingdom · Rotherhithe
1825, March 2 — Thames Tunnel

Construction begins ceremonially on Brunel's tunnel beneath the River Thames.

Brunel, Marc Isambard · Rotherhithe
1825, November — Rotherhithe Shaft

The sinking shaft is completed and Brunel's tunnelling shield is assembled beneath the Rotherhithe site.

Brunel, Marc Isambard · Rotherhithe
1826 — Tunnel Brick Lining Advanced behind Shield

Bricklayers construct the permanent tunnel lining directly behind the moving shield as excavation progresses beneath the Thames.

Brunel, Marc Isambard · Rotherhithe
1826, April — Resident Engineer

Brunel takes over as resident engineer of the Thames Tunnel after John Armstrong resigns through illness.

Brunel, Isambard Kingdom · Rotherhithe
1826, April — Thames Tunnel

Brunel becomes resident engineer after John Armstrong resigns because of illness and exhaustion.

Brunel, Isambard Kingdom · Rotherhithe
1827 — Riverbed Breach Repair Directed

After the first major inundation, Brunel directs repairs from the riverbed and prepares the workings for renewed excavation.

Brunel, Marc Isambard · River Thames
1827 — Diving Operations

Brunel uses diving equipment and surface inspections to locate and repair the breach above the flooded tunnel.

Brunel, Isambard Kingdom · River Thames
1827, January 3 — Chief Engineer

Brunel assumes full responsibility for directing the engineering work inside the Thames Tunnel.

Brunel, Isambard Kingdom · Rotherhithe
1827, May 18 — Thames Tunnel

The River Thames breaks into the tunnel and Brunel helps evacuate the workers before directing repairs to the breach.

Brunel, Isambard Kingdom · Rotherhithe
1827, May 18 — Tunnel Flood

The River Thames breaks into the workings and Brunel directs efforts to save the tunnel and repair the breach.

Brunel, Marc Isambard · Rotherhithe
1827, November 10 — Tunnel Banquet

A banquet is held inside the Thames Tunnel to demonstrate confidence in the pioneering construction project.

Brunel, Isambard Kingdom · Rotherhithe
1828 — Recovery

While recovering from his tunnel injuries Brunel develops ideas for a suspension bridge across the Avon Gorge.

Brunel, Isambard Kingdom · Brighton
1828 — Thames Tunnel

Brunel leaves the Thames Tunnel project because his injuries prevent him from continuing as resident engineer.

Brunel, Isambard Kingdom · Rotherhithe
1828, January 6 — Rescue

Brunel is pulled from the flooded tunnel after being trapped by timber and swept through the workings.

Brunel, Isambard Kingdom · Rotherhithe
1828, January 6 — Thames Tunnel

A major tunnel flood kills six workers and seriously injures Brunel, forcing him to withdraw from the project.

Brunel, Isambard Kingdom · Rotherhithe
1828, January 6 — Tunnel Flood

A major flood kills six workers, seriously injures Isambard Kingdom Brunel and forces suspension of the tunnel works.

Brunel, Marc Isambard · Rotherhithe
1828, June 16 — Tunnel Safety Paper Prepared for Royal Society

Brunel prepares observations on repairing the riverbed breach and protecting workers against another sudden inundation.

Brunel, Marc Isambard · London
1829 — French Engineering Honour

France recognises Brunel's international engineering achievements.

Brunel, Marc Isambard · France
1829 — Legion of Honour

Receives appointment to the French Legion of Honour.

Brunel, Marc Isambard · France
1829 — Clifton Suspension Bridge

Brunel submits designs to the competition for a suspension bridge across the Avon Gorge at Clifton.

Brunel, Isambard Kingdom · Bristol
1829 — Avon Gorge Bridge Design

Enters the competition while still a young independent engineer.

Brunel, Isambard Kingdom · Bristol
1829 — First Clifton Bridge Competition

Submits designs to the first Clifton Suspension Bridge competition.

Brunel, Isambard Kingdom · Bristol
1829 — Clifton Suspension Bridge Design Submitted

Brunel entered the competition to build a suspension bridge spanning the gorge between Clifton and Leigh Woods.

Brunel, Isambard Kingdom · Clifton Bridge
1829 — Brunel Enters Four Clifton Designs

Isambard Kingdom Brunel submits four distinct proposals to the initial competition for an Avon Gorge suspension bridge, challenging conventional assumptions about span length.

Brunel, Isambard Kingdom · Bristol
1829 — Telford Advances Alternative Gothic Crossing

After rejecting the competition proposals, Thomas Telford advances a three span Gothic bridge of his own design, but the alternative fails to secure sufficient support.

Telford, Thomas · Bristol
1829 — Telford Rejects Long Suspension Spans

As a judge of the first bridge competition, Thomas Telford raises objections to proposed long suspension spans over the Avon Gorge and rejects the shortlisted schemes.

Telford, Thomas · Bristol
1829, January — Institution of Civil Engineers

Brunel becomes an associate member of the Institution of Civil Engineers.

Brunel, Isambard Kingdom · London
1830 — Second Clifton Suspension Bridge Competition

Submits revised designs in the second competition for a bridge across the Avon Gorge.

Brunel, Isambard Kingdom · Bristol
1830 — Telford Competition Judgement Challenged

Brunel continues promoting his Avon Gorge design after Thomas Telford rejects the first competition entries and proposes his own bridge.

Brunel, Isambard Kingdom · Bristol
1830 — Clifton Bridge Design Reconsidered

A revised bridge competition considered competing proposals for crossing the Avon Gorge.

Brunel, Isambard Kingdom · Clifton Bridge
1830 — Gilbert Reviews Clifton Competition Finalists

Davies Gilbert serves among the judges who consider the finalists in the renewed Clifton bridge competition and assess the engineering feasibility of the rival schemes.

Gilbert, Davies · Bristol
1830 — Brunel Revises Proposal To Meet Weight Limits

Brunel modifies his shortlisted bridge scheme to meet the competition restrictions on weight and persuades the judges that his amended solution is practicable.

Brunel, Isambard Kingdom · Bristol
1830 — Rendel Submits Competing Bridge Scheme

James Meadows Rendel participates in the renewed competition for the Clifton crossing, joining other established engineers in proposing a bridge across the gorge.

Rendel, James Meadows · Bristol
1830 — Seaward Evaluates Clifton Bridge Designs

Civil engineer John Seaward judges competing proposals for the Clifton Suspension Bridge and participates in the assessment that initially places Brunel behind another entrant.

Seaward, John · Bristol
1830 — Brown Competes For Clifton Crossing

Engineer Samuel Brown enters the renewed Clifton bridge design competition, offering a rival suspension bridge proposal to the one developed by Isambard Kingdom Brunel.

Brown, Samuel · Bristol
1830 — Hawkes Design Initially Preferred By Judges

The judges initially prefer a design by William Hawkes of the Eagle Foundry in the second Clifton competition before Brunel revises his competing proposal.

Hawkes, William · Bristol
1830 — Clifton Suspension Bridge Competition

Acts as judge during the Clifton Suspension Bridge design competition.

Telford, Thomas · Bristol
1830, June 10 — Royal Society

Brunel is elected a Fellow of the Royal Society in recognition of his scientific and engineering promise.

Brunel, Isambard Kingdom · London
1831 — Bristol Docks

Brunel is appointed engineer to Bristol Docks and begins improving the harbour's engineering works.

Brunel, Isambard Kingdom · Bristol
1831 — Clifton Suspension Bridge

Brunel secures acceptance of his revised suspension bridge design and becomes project engineer.

Brunel, Isambard Kingdom · Bristol
1831 — Construction

Work begins on the Clifton Suspension Bridge, one of Brunel's earliest major independent projects.

Brunel, Isambard Kingdom · Clifton
1831 — Clifton Bridge Cost Estimate Prepared

Brunel estimates the suspension bridge project at about fifty-seven thousand pounds, including architectural treatment of the towers.

Brunel, Isambard Kingdom · Bristol
1831 — Clifton Main Span Fixed at 214 Metres

Brunel's accepted scheme uses a main suspension span of about 214 metres across the Avon Gorge.

Brunel, Isambard Kingdom · Avon Gorge
1831 — Dock Engineering Appointment Accepted

Brunel took responsibility for investigating technical improvements to Bristol's commercial harbour facilities.

Brunel, Isambard Kingdom · Bristol Docks
1831 — Revised Clifton Scheme Accepted

Brunel's revised suspension bridge proposal was selected for the planned crossing of the Avon Gorge.

Brunel, Isambard Kingdom · Clifton Bridge
1831 — Clifton Gorge Bridge Works Begin

Initial work commenced on the bridge project but civil disturbances in Bristol disrupted early progress.

Brunel, Isambard Kingdom · Clifton Bridge
1831 — Bristol Riots Interrupt Bridge Finance

The unrest in Bristol undermined investor confidence and contributed to suspension of early bridge work.

Brunel, Isambard Kingdom · Clifton Bridge
1831 — Brunel Estimates Fifty Seven Thousand Pounds

Brunel estimates the Clifton Suspension Bridge project at approximately fifty seven thousand pounds, including elaborate treatment of the towers and suspension works.

Brunel, Isambard Kingdom · Bristol
1831 — East Gorge Foundation Stone Laid

Construction of Brunel's proposed suspension bridge formally begins with the laying of a foundation stone on the Clifton side of the Avon Gorge in June 1831.

Brunel, Isambard Kingdom · Clifton
1831 — Egyptian Style Incorporated Into Clifton Design

Brunel develops Egyptian inspired architectural features for the planned Clifton bridge towers, integrating monumental appearance with the proposed iron suspension structure.

Brunel, Isambard Kingdom · Bristol
1831, February 15 — Babbage Engine Relocation Report

Brunel joins Bryan Donkin and others in reporting to the Treasury on moving Charles Babbage's calculating engine.

Brunel, Marc Isambard · London
1831, March 16 — Clifton Bridge Engineer Appointed

Brunel is appointed engineer for the Clifton Suspension Bridge after his revised design is selected.

Brunel, Isambard Kingdom · Bristol
1831, June 20 — Clifton Suspension Bridge

A ceremony marks the start of construction and work begins on the Clifton side of the gorge.

Brunel, Isambard Kingdom · Bristol
1831, October — Clifton Suspension Bridge

Construction is halted after the Bristol riots damage confidence and stop subscriptions to the bridge company.

Brunel, Isambard Kingdom · Bristol
1832 — Bristol Docks

Brunel designs a deep scouring sluice to draw accumulated silt from the harbour into the tidal River Avon.

Brunel, Isambard Kingdom · Bristol
1832 — Bristol Docks

Brunel designs three shallow sluices to regulate the water level within Bristol's Floating Harbour.

Brunel, Isambard Kingdom · Bristol
1832 — Bristol Docks

Brunel investigates the severe accumulation of mud and silt affecting shipping in Bristol's Floating Harbour.

Brunel, Isambard Kingdom · Bristol
1832 — Bristol Docks

Brunel recommends a dredging drag boat to scrape mud from the quay walls toward the harbour's scouring sluice.

Brunel, Isambard Kingdom · Bristol
1832 — Personal Life

Brunel meets Mary Elizabeth Horsley through his friendship with his brother-in-law Benjamin Hawes.

Brunel, Isambard Kingdom · London
1832 — Harbour Silting Survey Conducted

Brunel examined how silt accumulated along the quays and made parts of Bristol's Floating Harbour difficult to use.

Brunel, Isambard Kingdom · Bristol Docks
1832 — Underfall Dam Solution Designed

Brunel proposed using controlled water flows beneath the harbour dam to discharge suspended silt into the New Cut.

Brunel, Isambard Kingdom · Bristol Docks
1832 — Dock Culvert Scheme Recommended

Brunel recommended culverts equipped with sluices to help scour mud from the city docks.

Brunel, Isambard Kingdom · Bristol Docks
1832 — Harbour Current Improvement Proposed

Brunel concluded that a sustained movement of water would improve sediment clearance more effectively than occasional dredging alone.

Brunel, Isambard Kingdom · Bristol Docks
1832 — Quayside Mud Removal Machinery Proposed

Brunel proposed mechanical equipment to move mud away from the harbour walls toward the scouring watercourse.

Brunel, Isambard Kingdom · Bristol Docks
1832 — Dock Water Regulation Assessed

Brunel evaluated how water levels could be managed while maintaining the harbour's commercial navigation.

Brunel, Isambard Kingdom · Bristol Docks
1833 — Railway Survey

Brunel surveys the proposed Great Western Railway route on horseback and negotiates with landowners.

Brunel, Isambard Kingdom · England
1833 — Three-Month GWR Route Survey Completed

Brunel completes an intensive survey of the proposed London-to-Bristol railway and presents a route engineered for speed and gentle gradients.

Brunel, Isambard Kingdom · England
1833 — Dock Improvement Reports Debated

The Bristol Dock Company considered Brunel's proposals for combating silt and improving the harbour's operation.

Brunel, Isambard Kingdom · Bristol Docks
1833 — Bath Railway Corridor Surveyed

Brunel surveyed a railway route through the Avon valley to connect Bristol with Bath and the line toward London.

Brunel, Isambard Kingdom · Bath Avon
1833 — Chippenham Rail Route Surveyed

Brunel surveyed the Wiltshire railway corridor while planning the Great Western line between London and Bristol.

Brunel, Isambard Kingdom · Chippenham GWR
1833 — Paddington Railway Terminus Planned

Brunel's proposed Great Western route placed the London terminus at Paddington beside existing canal transport links.

Brunel, Isambard Kingdom · Paddington
1833, March — Great Western Railway

Brunel is appointed engineer for the proposed railway between Bristol and London.

Brunel, Isambard Kingdom · Bristol
1833, July 30 — Great Western Railway

The proposed Great Western Railway route between Bristol and London is formally announced.

Brunel, Isambard Kingdom · Bristol
1834 — GWR Level Route Principle Defended

Brunel argues for a railway kept as level and straight as practicable so trains can run faster and more efficiently.

Brunel, Isambard Kingdom · London
1834 — Sluice Construction Programme Advanced

The dock improvement works developed the infrastructure needed to channel scouring water beneath the retaining dam.

Brunel, Isambard Kingdom · Bristol Docks
1834 — Avon Valley Alignment Evaluated

Brunel assessed gradients and river crossings on the proposed western section of the Great Western Railway.

Brunel, Isambard Kingdom · Bath Avon
1834, March 20 — HMS Thetis Treasure Recovery Advice

Brunel corresponds with the Royal Society about engineering methods connected with recovering treasure from the wreck of HMS Thetis.

Brunel, Marc Isambard · London
1834, December — Government Loan

A government loan provides the Thames Tunnel Company with funds needed to resume construction.

Brunel, Marc Isambard · London
1835 — Great Western Railway

Parliament authorises the Great Western Railway and allows construction of Brunel's London to Bristol route.

Brunel, Isambard Kingdom · Bristol
1835 — Transatlantic Steamship

Brunel proposes extending the Great Western transport system from Bristol to New York by steamship.

Brunel, Isambard Kingdom · Bristol
1835 — Broad Gauge Engineering Case Presented

Brunel promotes the seven-foot broad gauge as a means of providing stability, speed and passenger comfort.

Brunel, Isambard Kingdom · London
1835 — Floating Harbour Scouring Scheme Implemented

Engineered sluices enabled water released from the dock to carry suspended mud into the tidal New Cut.

Brunel, Isambard Kingdom · Bristol Docks
1835 — Bath Railway Works Authorised

Parliamentary approval allowed construction of the Great Western Railway through Bath and the neighbouring Avon valley.

Brunel, Isambard Kingdom · Bath Avon
1835 — Wiltshire Railway Section Approved

Parliament authorised the railway through Chippenham as part of the wider Great Western main line.

Brunel, Isambard Kingdom · Chippenham GWR
1835 — Great Western Transatlantic Steamship Plan Formed

Brunel proposed an ocean steamship to connect Bristol with North America and extend the transport ambitions of the Great Western enterprise.

Brunel, Isambard Kingdom · Great Western
1835 — Paddington Railway Development Authorised

The Great Western Railway Act enabled construction of the line from its London terminus toward Bristol.

Brunel, Isambard Kingdom · Paddington
1835, August 31 — Great Western Railway Act Receives Approval

Parliament authorises construction of the Great Western Railway between London and Bristol.

Brunel, Isambard Kingdom · London
1835, October — Great Western Steamship Company

The Great Western Steamship Company is formed to develop Brunel's transatlantic steamship plan.

Brunel, Isambard Kingdom · Bristol
1836 — Improved Tunnel Shield Installed

A larger improved shield is assembled so excavation of the Thames Tunnel can resume after the long suspension.

Brunel, Marc Isambard · Rotherhithe
1836 — Box Tunnel

Brunel begins sinking exploratory shafts to examine the geology along the proposed route through Box Hill.

Brunel, Isambard Kingdom · Box Hill
1836 — Broad Gauge

Brunel adopts a broad railway gauge of seven feet and one quarter inch for the Great Western Railway.

Brunel, Isambard Kingdom · England
1836 — Clifton Suspension Bridge

Construction resumes after renewed commercial confidence brings further investment to the project.

Brunel, Isambard Kingdom · Bristol
1836 — Railway Construction

Large-scale construction begins on Brunel's Great Western Railway between London and Bristol.

Brunel, Isambard Kingdom · Bristol
1836 — Broad-Gauge Bridge Clearances Standardised

Brunel's broad gauge determines the generous track widths and spans required for many early Great Western bridges.

Brunel, Isambard Kingdom · England
1836 — GWR Main-Line Construction Contracts Let

Construction of the London-to-Bristol main line proceeds through multiple major contracts under Brunel's overall engineering direction.

Brunel, Isambard Kingdom · England
1836 — Hanwell Viaduct Works

The viaduct becomes an early showpiece of Brunel's railway engineering.

Brunel, Isambard Kingdom · Hanwell
1836 — South Devon Main-Line Survey Completed

Brunel surveys a railway route between Exeter and Plymouth that later becomes the South Devon Railway.

Brunel, Isambard Kingdom · Devon
1836 — South Wales Railway Engineering

Extends his railway engineering work into industrial South Wales.

Brunel, Isambard Kingdom · South Wales
1836 — Taff Vale Railway Appointment

Is appointed engineer for the Taff Vale Railway project.

Brunel, Isambard Kingdom · South Wales
1836 — Wharncliffe Viaduct Construction

Directs construction of the Wharncliffe Viaduct for the Great Western Railway.

Brunel, Isambard Kingdom · Hanwell
1836 — Underfall Dam Flow Control Refined

Harbour operators used the culvert sluices to regulate scouring currents without draining the Floating Harbour.

Brunel, Isambard Kingdom · Bristol Docks
1836 — Bath Approaches Engineering Planned

Brunel designed the approach through the confined Bath valley with railway bridges and substantial masonry works.

Brunel, Isambard Kingdom · Bath Avon
1836 — Chippenham Alignment Engineering Planned

Brunel planned the route through Chippenham to maintain gentle gradients suitable for broad gauge locomotives.

Brunel, Isambard Kingdom · Chippenham GWR
1836 — Leigh Woods Foundation Stone Laid

Construction resumed with a ceremony marking the foundation of the western bridge abutment.

Brunel, Isambard Kingdom · Clifton Bridge
1836 — Great Western Paddle Steamer Design Developed

Brunel designed a large wooden hulled ship propelled by steam powered paddle wheels for Atlantic crossings.

Brunel, Isambard Kingdom · Great Western
1836 — Hungerford Thames Bridge Scheme Considered

Brunel's engineering work extended to proposals for a pedestrian suspension crossing over the River Thames at Hungerford.

Brunel, Isambard Kingdom · Hungerford
1836 — Paddington Railway Approach Works Begin

Contractors developed cuttings bridges and track formation for the western railway approaches to Paddington.

Brunel, Isambard Kingdom · Paddington
1836 — Auxiliary Sailing Rig Specified

Great Western was planned with four masts and sails to supplement her steam propulsion during ocean crossings.

Brunel, Isambard Kingdom · Bristol
1836 — Bristol New York Route Planned

Brunel advocated a direct steamship service from Bristol to New York as an extension of modern British transport networks.

Brunel, Isambard Kingdom · Bristol
1836 — Coal Capacity Shapes Ship Design

Brunel's design allowed substantial bunker space so the ship could make the Atlantic passage under steam without routine intermediate refuelling.

Brunel, Isambard Kingdom · Bristol
1836 — Great Western Steamship Venture Begins

Brunel worked with Bristol investors to establish a company dedicated to regular steamship communication between Britain and New York.

Brunel, Isambard Kingdom · Bristol
1836 — Paddle Propulsion Selected

Brunel's transatlantic vessel was designed with side paddle wheels driven by powerful marine steam engines.

Brunel, Isambard Kingdom · Bristol
1836 — Wooden Hull Chosen For Western

The designers adopted a large wooden hull for Great Western while incorporating steam machinery intended for prolonged ocean service.

Brunel, Isambard Kingdom · Bristol
1836 — Guppy Helps Organize Atlantic Steamship Company

Thomas Guppy joined Brunel and other Bristol promoters in organizing the company that would commission the Great Western.

Guppy, Thomas · Bristol
1836 — Patterson Begins Great Western Hull

William Patterson's shipbuilding yard began constructing the hull of the pioneering transatlantic paddle steamer Great Western.

Patterson, William · Bristol
1836 — Leigh Woods Foundation Ceremony Held

On 27 August 1836, the foundation stone of the Leigh Woods abutment is laid as bridge construction resumes after years of financial and political interruption.

Brunel, Isambard Kingdom · Leigh Woods
1836, March — Thames Tunnel

A larger improved tunnelling shield is assembled and excavation beneath the Thames resumes.

Brunel, Marc Isambard · Rotherhithe
1836, May — Engagement

Brunel proposes marriage to Mary Elizabeth Horsley during a family walk in London.

Brunel, Isambard Kingdom · London
1836, July 5 — Marriage

Brunel marries Mary Elizabeth Horsley and later establishes a home and office in Westminster.

Brunel, Isambard Kingdom · St Mary Abbots
1836, August 27 — Leigh Woods Abutment Foundation Laid

Construction restarts with the foundation stone for the Leigh Woods abutment laid on the western side of the gorge.

Brunel, Isambard Kingdom · Bristol
1837 — Clifton Suspension Bridge

The main contractors fail financially, but the bridge towers are raised in unfinished stone.

Brunel, Isambard Kingdom · Bristol
1837 — Institution of Civil Engineers

Brunel becomes a full member of the Institution of Civil Engineers.

Brunel, Isambard Kingdom · London
1837 — First Major GWR Structure

The structure is the first major engineering work completed on the GWR.

Brunel, Isambard Kingdom · Hanwell
1837 — Great Western Hull Built by William Patterson

William Patterson's Bristol yard constructs Brunel's large wooden paddle steamship for the Great Western Steamship Company.

Brunel, Isambard Kingdom · Bristol
1837 — Wharncliffe Becomes First Major GWR Structure

The Wharncliffe Viaduct becomes the first major completed structure on Brunel's Great Western Railway.

Brunel, Isambard Kingdom · Hanwell
1837 — Wharncliffe Viaduct Completed

Completes the Wharncliffe Viaduct on the Great Western Railway.

Brunel, Isambard Kingdom · Hanwell
1837 — River Avon Crossing Locations Selected

The railway engineering plans identified places where the main line would cross or run alongside the River Avon.

Brunel, Isambard Kingdom · Bath Avon
1837 — Wiltshire Earthworks Begin

Work on the line toward Chippenham involved cuttings embankments and structures across the Wiltshire landscape.

Brunel, Isambard Kingdom · Chippenham GWR
1837 — Clifton West Abutment Work Progresses

Construction teams developed the masonry support at Leigh Woods for the planned suspended bridge deck.

Brunel, Isambard Kingdom · Clifton Bridge
1837 — Great Western Launch At Bristol Celebrated

Brunel's large paddle steamship entered the water before machinery fitting and sea trials were completed.

Brunel, Isambard Kingdom · Great Western
1837 — Hungerford Bridge Project Advanced

Plans progressed for a suspension bridge to connect the north bank of the Thames with the south bank near Hungerford Market.

Brunel, Isambard Kingdom · Hungerford
1837 — Paddington Temporary Station Prepared

Facilities were built to allow the Great Western Railway to start passenger services before a permanent terminus existed.

Brunel, Isambard Kingdom · Paddington
1837 — London Engineers Equip Steam Boilers

The London fitting out supplied the large boilers necessary to sustain Great Western's paddle wheel propulsion.

Brunel, Isambard Kingdom · London
1837 — New Steamer Sets Size Benchmark

Great Western's exceptionally large dimensions made her one of the most ambitious merchant steamships of her time.

Brunel, Isambard Kingdom · Bristol
1837 — Ocean Steamer Receives Four Masts

Great Western carried a four masted auxiliary sailing arrangement alongside her steam machinery.

Brunel, Isambard Kingdom · Bristol
1837 — Passenger Cabins Planned For Ocean Crossing

The vessel's accommodation was arranged for paying cabin passengers and accompanying servants on the Bristol to New York route.

Brunel, Isambard Kingdom · Bristol
1837 — Side Lever Engines Installed In London

Great Western received side lever steam engines supplied by the engineering firm Maudslay Sons and Field.

Brunel, Isambard Kingdom · London
1837 — Steamship Moves For Engine Installation

After launching at Bristol, Great Western travelled to London for fitting out with her propulsion machinery.

Brunel, Isambard Kingdom · London
1837 — Hosken Selected For Great Western Command

Royal Navy lieutenant James Hosken was appointed to command Great Western before her inaugural Atlantic service.

Hosken, James · Bristol
1837 — Bristol Shipbuilders Complete Wooden Hull

Patterson's Bristol yard brought the vessel's large oak hull to the launch stage before the ship received her engines.

Patterson, William · Bristol
1837 — Western Abutment Contractor Fails

The company undertaking work on the Leigh Woods abutment encounters financial failure, disrupting renewed construction on Brunel's Clifton suspension bridge.

Brunel, Isambard Kingdom · Leigh Woods
1837, July 19 — SS Great Western

The wooden paddle steamship SS Great Western is launched at Bristol under Brunel's direction.

Brunel, Isambard Kingdom · Bristol
1838 — Maidenhead Railway Bridge

Construction of Brunel's low-arched brick railway bridge across the Thames is completed.

Brunel, Isambard Kingdom · Maidenhead
1838 — Brunel GWR Overbridge

The structure reflects Brunel's broad-gauge railway design.

Brunel, Isambard Kingdom · Slough
1838 — Dumb Bell Bridge

Designs the sharply skewed Dumb Bell Bridge beneath the Great Western Railway.

Brunel, Isambard Kingdom · Taplow
1838 — Early Broad-Gauge Bridge

The bridge preserves Brunel's early broad-gauge engineering approach.

Brunel, Isambard Kingdom · Slough
1838 — Early Brunel Iron Bridge

The work is among Brunel's earliest iron bridge designs.

Brunel, Isambard Kingdom · London
1838 — Early GWR Broad-Gauge Operations Begin

The first working section of the Great Western Railway demonstrates Brunel's broad-gauge track and early bridge designs.

Brunel, Isambard Kingdom · Maidenhead
1838 — Early GWR Overbridge

The bridge forms part of Brunel's first London-to-Maidenhead contracts.

Brunel, Isambard Kingdom · Slough
1838 — Great Britain Project Begins as City of New York

Early plans for Brunel's second major steamship envisage a wooden paddle vessel initially called City of New York.

Brunel, Isambard Kingdom · Bristol
1838 — Great Western Maiden Voyage Passenger Loss

Many booked passengers cancel after the fire, leaving only a small number aboard when Great Western departs for New York.

Brunel, Isambard Kingdom · Bristol
1838 — Leigh Road Bridge

Completes the Leigh Road overbridge on the early Great Western Railway.

Brunel, Isambard Kingdom · Slough
1838 — Middlegreen Road Bridge

Completes an early Great Western Railway overbridge at Middlegreen Road.

Brunel, Isambard Kingdom · Slough
1838 — Paddington Canal Iron Bridge

Designs an early iron bridge across the Paddington Arm of the canal.

Brunel, Isambard Kingdom · London
1838 — St Mary's Road Bridge

Completes the St Mary's Road bridge on the Great Western Railway.

Brunel, Isambard Kingdom · Slough
1838 — Taplow Skew Bridge

Solves a difficult road crossing with an ingenious skew arch.

Brunel, Isambard Kingdom · Taplow
1838 — Cumberland Lock Enlargement Considered

Brunel developed proposals to improve harbour entrances as increasing steamship dimensions challenged the original locks.

Brunel, Isambard Kingdom · Bristol Docks
1838 — Bath Valley Railway Construction Advances

Contractors worked on embankments bridges and cuttings needed to carry broad gauge trains through the Avon valley.

Brunel, Isambard Kingdom · Bath Avon
1838 — Chippenham Station Site Selected

The Great Western route incorporated a station site to serve Chippenham and surrounding communities.

Brunel, Isambard Kingdom · Chippenham GWR
1838 — Clifton Eastern Tower Masonry Advances

Contractors continued the Clifton side tower and its supporting masonry above the Avon Gorge.

Brunel, Isambard Kingdom · Clifton Bridge
1838 — Great Western Engine Room Fire Investigated

A fire aboard the vessel shortly before its maiden Atlantic voyage delayed preparations and injured Brunel.

Brunel, Isambard Kingdom · Great Western
1838 — Hungerford River Span Surveyed

Brunel assessed the Thames crossing and the foundation requirements for the proposed suspension structure.

Brunel, Isambard Kingdom · Hungerford
1838 — Paddington Maidenhead Passenger Services Begin

The first public Great Western services operated between Paddington and Maidenhead in June.

Brunel, Isambard Kingdom · Paddington
1838 — Paddington Broad Gauge Platforms Used

The temporary terminus served trains built to Brunel's unusually wide railway gauge.

Brunel, Isambard Kingdom · Paddington
1838 — Paddington Canal Iron Bridge Designed

Brunel designed an iron bridge at the Paddington Arm as railway works crossed the canal network.

Brunel, Isambard Kingdom · Paddington
1838 — Brunel Injured During Ship Fire

Brunel was injured during the response to a fire involving Great Western before the first Atlantic voyage.

Brunel, Isambard Kingdom · Bristol
1838 — Machinery Fire Delays Atlantic Departure

A fire around Great Western's machinery during preparations for her inaugural crossing delayed the beginning of service.

Brunel, Isambard Kingdom · Bristol
1838 — Steamship Design Retains Auxiliary Sail

Great Western's four masts provided auxiliary sailing capability alongside the paddle wheels during her early transatlantic operations.

Brunel, Isambard Kingdom · Atlantic Ocean
1838 — Atlantic Mail Conveyance Gains New Route

Great Western carried letters as well as passengers and freight, contributing to faster communications across the ocean.

Hosken, James · Atlantic Ocean
1838 — Captain Reports Early Steamship Performance

Experience gathered under Captain Hosken provided practical evidence about fuel consumption and handling on lengthy steam powered voyages.

Hosken, James · Atlantic Ocean
1838 — First Homeward Crossing Reaches Bristol

The ship returned to Bristol on 22 May after a successful inaugural round trip between Britain and America.

Hosken, James · Bristol
1838 — First Ocean Crossing Uses Steam Power

Captain Hosken demonstrated that a large paddle steamer could cross the North Atlantic while relying predominantly on steam propulsion.

Hosken, James · Atlantic Ocean
1838 — First Return Voyage Leaves New York

Great Western departed New York on 7 May for the first homeward voyage of her scheduled steamship service.

Hosken, James · New York
1838 — First Sailing Carries Few Passengers

The ship began her inaugural Atlantic voyage with few passengers after the earlier fire discouraged some prospective travellers.

Hosken, James · Atlantic Ocean
1838 — Great Western Advertises Direct Atlantic Route

The advertised direct passage under Captain Hosken promised that Great Western would avoid a routine coal stop in Ireland.

Hosken, James · Bristol
1838 — Great Western Cabin Fares Advertised

Contemporary advertisements under Captain Hosken offered cabin passage to New York with provisions included in the fare.

Hosken, James · Bristol
1838 — Great Western Competes With Sirius

Great Western reached New York shortly after Sirius despite having left Britain later and having taken much less time at sea.

Hosken, James · New York
1838 — Great Western Prepares New York Return

Following the inaugural arrival, Captain Hosken prepared the ship for her first eastbound passage to Britain.

Hosken, James · New York
1838 — Inaugural Crossing Wins Speed Recognition

Great Western's first westbound Atlantic crossing established a leading passage time for early transatlantic steamships.

Hosken, James · New York
1838 — July Eastbound Run Sets Faster Benchmark

Great Western reduced her eastbound Atlantic passage time again during the summer of 1838.

Hosken, James · Atlantic Ocean
1838 — June Atlantic Crossing Improves Westbound Time

During a subsequent 1838 voyage Great Western improved her westbound crossing time as the crew gained ocean steaming experience.

Hosken, James · Atlantic Ocean
1838 — New York Passenger Booking Service Established

The ship's first arrival allowed operators to advertise and book return accommodation from New York to Bristol.

Hosken, James · New York
1838 — New York Sailing Notice Names Commander

Public notices identified Lieutenant James Hosken as commander of the steamship's first transatlantic service.

Hosken, James · Bristol
1838 — Passenger Service Demonstrates Ocean Reliability

Repeated voyages supported the case that steamships could maintain a commercially useful service across the North Atlantic.

Hosken, James · Bristol
1838 — Scheduled Atlantic Steam Service Continues

Under Captain Hosken, Great Western continued regular North Atlantic crossings following her successful first round trip.

Hosken, James · Atlantic Ocean
1838 — Western Establishes Eastbound Passage Record

Great Western set an important early benchmark for the speed of eastbound Atlantic steamship travel.

Hosken, James · Atlantic Ocean
1838, March 24 — Great Western Sea Trial Completed

SS Great Western completes an early sea trial before beginning her first Atlantic service.

Brunel, Isambard Kingdom · Bristol
1838, March 31 — Brunel Injured during Great Western Fire

Brunel is injured after falling about twenty feet during the confusion surrounding the Great Western engine-room fire.

Brunel, Isambard Kingdom · Bristol
1838, March 31 — Great Western Engine-Room Fire Contained

An engine-room fire breaks out as Great Western prepares for her maiden Atlantic voyage but is extinguished with limited ship damage.

Brunel, Isambard Kingdom · Bristol
1838, April 8 — SS Great Western

SS Great Western departs Bristol on her first Atlantic voyage to New York.

Brunel, Isambard Kingdom · Bristol
1838, April 23 — SS Great Western

SS Great Western reaches New York and demonstrates the commercial practicality of regular steamship crossings.

Brunel, Isambard Kingdom · New York
1838, June 4 — Great Western Railway

The first public section of the Great Western Railway opens between Paddington and Maidenhead.

Brunel, Isambard Kingdom · Paddington
1838, June 4 — Paddington Station

The first temporary Great Western Railway terminus at Paddington opens for services between London and Maidenhead.

Brunel, Isambard Kingdom · London
1838, December — Box Tunnel

Work begins on Box Tunnel through Box Hill for the Great Western Railway.

Brunel, Isambard Kingdom · Box Hill
1839 — Bath GWR Bridge

The Tudor-Gothic bridge forms part of Brunel's Bristol-Bath railway works.

Brunel, Isambard Kingdom · Bath
1839 — Brook Road Bridge

Completes Brook Road Bridge for the Great Western Railway near Bath.

Brunel, Isambard Kingdom · Bath
1839 — Commercial Electric Telegraph

Supports installation of electric telegraph wires beside the Great Western Railway.

Brunel, Isambard Kingdom · Great Western Railway
1839 — GWR Shareholder Challenge Defeated

Brunel successfully defends his engineering decisions when dissatisfied shareholders attempt to remove him from the railway project.

Brunel, Isambard Kingdom · London
1839 — Iron Hull Recommended for Great Britain

Brunel and the building committee recommend changing the new steamship from wood to iron construction.

Brunel, Isambard Kingdom · Bristol
1839 — Paddington-West Drayton Telegraph

The Paddington-West Drayton link becomes an early commercial telegraph installation.

Brunel, Isambard Kingdom · Great Western Railway
1839 — River Avon Viaduct Design Developed

Brunel develops the masonry viaduct carrying the Great Western Railway across the River Avon in Wiltshire.

Brunel, Isambard Kingdom · Bremhill
1839 — Brook Road Crossing Built

A railway overbridge at Brook Road formed part of Brunel's engineered approach toward Bath.

Brunel, Isambard Kingdom · Bath Avon
1839 — Avon Viaduct Masonry Prepared

Railway builders prepared the stonework for an Avon crossing on the Great Western route through Wiltshire.

Brunel, Isambard Kingdom · Bath Avon
1839 — Chippenham River Crossing Designed

Brunel's engineering plans provided a railway crossing over the River Avon near Chippenham.

Brunel, Isambard Kingdom · Chippenham GWR
1839 — Chippenham Viaduct Stonework Advanced

Masonry construction progressed on the rail viaduct required to carry the main line across the Avon valley.

Brunel, Isambard Kingdom · Chippenham GWR
1839 — Bridge Anchor Tunnels Constructed

Engineers excavated and built underground anchorage structures to resist the future suspension chain loads.

Brunel, Isambard Kingdom · Clifton Bridge
1839 — Hungerford Suspension Bridge Layout Planned

Design work considered a high central suspension span supported by masonry towers and anchored iron chains.

Brunel, Isambard Kingdom · Hungerford
1839 — Great Western Passenger Expansion Planned

The steamship underwent a programme of alterations intended to provide additional passenger accommodation.

Brunel, Isambard Kingdom · Bristol
1839 — Ship Lengthening Work Commences

Refitting work in the period from 1839 to 1840 lengthened Great Western and increased her accommodation capacity.

Brunel, Isambard Kingdom · Bristol
1839 — Steamship Refit Increases Internal Space

Alterations to Great Western during the 1839 to 1840 period expanded the space available for commercial operations.

Brunel, Isambard Kingdom · Bristol
1839 — Hosken Receives Commemorative Telescope

Passengers presented Captain Hosken with a telescope to commemorate an exceptionally rapid westbound crossing in May 1839.

Hosken, James · New York
1839 — May Voyage Improves Westbound Atlantic Record

A May crossing by Great Western established a faster westbound Atlantic passage time under Captain Hosken.

Hosken, James · New York
1839, July 1 — Maidenhead Railway Bridge

Maidenhead Railway Bridge opens to traffic and vindicates Brunel's unusually flat arch design.

Brunel, Isambard Kingdom · Maidenhead
1839, July 18 — SS Great Britain

Construction begins on Brunel's iron-hulled transatlantic steamship SS Great Britain.

Brunel, Isambard Kingdom · Bristol
1839, August — Box Tunnel

Difficult rock strata and heavy water ingress delay excavation, with less than half of the tunnel completed.

Brunel, Isambard Kingdom · Box Hill
1840 — Archimedes Screw Trials Studied

Brunel studies Francis Pettit Smith's screw-propelled Archimedes during trials and demonstrations at Bristol.

Brunel, Isambard Kingdom · Bristol
1840 — Bath Avon Railway Bridge

The crossing carries the Great Western Railway through the city.

Brunel, Isambard Kingdom · Bath
1840 — Bath Spa Skew Bridge

Designs the skew bridge immediately west of Bath Spa station.

Brunel, Isambard Kingdom · Bath
1840 — Bourton Church Bridge Completed

A Brunel-designed accommodation bridge is completed on the Challow to Wootton Bassett section of the Great Western Railway.

Brunel, Isambard Kingdom · Bourton
1840 — By Brook Culvert Completed

Brunel's stone culvert over By Brook is completed as part of the Great Western route through the Box area.

Brunel, Isambard Kingdom · Box
1840 — Cheltenham and Great Western Union Bridge

The limestone bridge uses Brunel's characteristic elliptical arch.

Brunel, Isambard Kingdom · Kemble
1840 — Clifton Chain Contract Awarded

The Copperhouse Foundry at Hayle receives the contract to manufacture suspension chains for Brunel's Clifton bridge.

Brunel, Isambard Kingdom · Hayle
1840 — Dorchester Street Railway Bridge

The structure carries Brunel's Great Western route through central Bath.

Brunel, Isambard Kingdom · Bath
1840 — Gatehampton Viaduct

Completes the original Gatehampton Viaduct across the River Thames.

Brunel, Isambard Kingdom · Gatehampton
1840 — Great Britain Screw Conversion Approved

The steamship directors accept Brunel's recommendation and approve converting the vessel to screw propulsion.

Brunel, Isambard Kingdom · Bristol
1840 — Highnams Farm Bridge

Designs a Great Western Railway bridge near Saltford.

Brunel, Isambard Kingdom · Saltford
1840 — Kemble Railway Bridge

Designs an accommodation bridge south of Kemble for the railway.

Brunel, Isambard Kingdom · Kemble
1840 — Keynsham Railway Crossing

The bridge forms part of Brunel's Bristol-to-Bath railway section.

Brunel, Isambard Kingdom · Keynsham
1840 — Moulsford Thames Crossing

The viaduct forms part of the pioneering Great Western main line.

Brunel, Isambard Kingdom · Moulsford
1840 — Moulsford Viaduct

Completes the original Moulsford Viaduct across the Thames.

Brunel, Isambard Kingdom · Moulsford
1840 — River Chew Bridge

Designs the Great Western Railway crossing over the River Chew.

Brunel, Isambard Kingdom · Keynsham
1840 — Saltford GWR Bridge

The masonry structure belongs to the pioneering Bristol-Bath section.

Brunel, Isambard Kingdom · Saltford
1840 — St James Railway Bridge

Completes the skew railway bridge over the Avon at Bath.

Brunel, Isambard Kingdom · Bath
1840 — Thames Railway Crossing

The elegant masonry crossing carries Brunel's broad-gauge railway.

Brunel, Isambard Kingdom · Gatehampton
1840 — Twerton Railway Works

The structure incorporates arches, railway facilities and workers' accommodation.

Brunel, Isambard Kingdom · Twerton
1840 — Twerton Viaduct Completed

Completes the long Twerton Viaduct for the Great Western Railway.

Brunel, Isambard Kingdom · Twerton
1840 — Twerton Worker Housing Integrated into Viaduct

Brunel incorporates railway facilities and workers' dwellings into the long masonry viaduct at Twerton.

Brunel, Isambard Kingdom · Twerton
1840 — Bath Railway Approaches Completed

Brunel's line used masonry bridges and viaducts to carry trains through the city and its narrow approaches.

Brunel, Isambard Kingdom · Bath Avon
1840 — Twerton Viaduct Enters Railway Service

The long masonry viaduct at Twerton provided a continuous rail alignment on the western approach to Bath.

Brunel, Isambard Kingdom · Bath Avon
1840 — River Chew Railway Crossing Opens

The Great Western route crossed the River Chew at Keynsham on its passage between Bath and Bristol.

Brunel, Isambard Kingdom · Bath Avon
1840 — Saltford Railway Bridge Enters Use

Railway structures near Saltford carried Brunel's broad gauge line through the Avon valley.

Brunel, Isambard Kingdom · Bath Avon
1840 — Bath Bristol Railway Services Commence

Railway passengers could travel between Bath and Bristol using the newly opened Great Western section.

Brunel, Isambard Kingdom · Bath Avon
1840 — Bath Station Opens For Passengers

Bath's Great Western Railway station commenced operations as the new Bristol to Bath section opened.

Brunel, Isambard Kingdom · Bath Avon
1840 — Bath Riverside Railway Embankments Established

The broad gauge alignment relied on embankments to maintain manageable gradients beside sections of the Avon.

Brunel, Isambard Kingdom · Bath Avon
1840 — Dorchester Street Rail Bridge Opens

A railway bridge near Dorchester Street carried the Great Western route through Bath's built up centre.

Brunel, Isambard Kingdom · Bath Avon
1840 — Avon Valley Rail Gradients Controlled

Brunel's carefully surveyed route minimised steep railway gradients along the valley approaching Bath.

Brunel, Isambard Kingdom · Bath Avon
1840 — Bath River Bridges Support Broad Gauge

Brunel's river crossings were designed for the wider track gauge adopted by the Great Western Railway.

Brunel, Isambard Kingdom · Bath Avon
1840 — Wootton Bassett Line Reaches Chippenham

The Great Western Railway opened its section from Wootton Bassett to Chippenham in December.

Brunel, Isambard Kingdom · Chippenham GWR
1840 — Chippenham Station Opens For Rail Traffic

The initial railway connection made Chippenham an operating terminus while the remaining route west was unfinished.

Brunel, Isambard Kingdom · Chippenham GWR
1840 — Chippenham Railway Goods Access Established

The arrival of the railway provided a new means of moving Wiltshire goods toward the growing Great Western network.

Brunel, Isambard Kingdom · Chippenham GWR
1840 — Chippenham Broad Gauge Track Enters Service

The new section used Brunel's broad gauge track system rather than the standard gauge used on many other railways.

Brunel, Isambard Kingdom · Chippenham GWR
1840 — Chippenham Becomes Temporary Western Terminus

The railhead at Chippenham served as an interim endpoint pending the completion of the line through Box Tunnel.

Brunel, Isambard Kingdom · Chippenham GWR
1840 — Clifton Bridge Chain Contract Awarded

The bridge project arranged manufacture of its suspension chains at the Copperhouse Foundry in Cornwall.

Brunel, Isambard Kingdom · Clifton Bridge
1840 — Hungerford Suspension Chain Design Prepared

Brunel adopted wrought iron suspension chains to support the bridge deck across the Thames.

Brunel, Isambard Kingdom · Hungerford
1840 — Hungerford Bridge Chain Manufacture Commences

Chain manufacture at the Copperhouse Foundry supported the large suspension bridge projects undertaken by Brunel.

Brunel, Isambard Kingdom · Hungerford
1840 — Great Western Lengthening Programme Completed

The ship's refit produced a longer vessel better suited to carrying additional passengers on Atlantic passages.

Brunel, Isambard Kingdom · Bristol
1840 — Atlantic Steamer Returns After Refit

Great Western continued her transatlantic career after modifications designed to improve carrying capacity.

Hosken, James · Atlantic Ocean
1840 — Great Western Faces Cunard Competition

The arrival of Cunard steamers created a powerful new competitor for Great Western's North Atlantic passenger service.

Hosken, James · Atlantic Ocean
1840 — Copperhouse Foundry Receives Chain Contract

The Clifton bridge undertaking contracts with Copperhouse Foundry in Hayle to produce suspension chains, although the project's financial difficulties later prevent their intended installation.

Brunel, Isambard Kingdom · Hayle
1840 — Leigh Woods Abutment Construction Advances

The Leigh Woods masonry abutment reaches an advanced state by 1840, forming a substantial foundation for the suspension structure planned across the gorge.

Brunel, Isambard Kingdom · Leigh Woods
1840, August 31 — Bath-Bristol Railway Section Opens

The Great Western section between Bristol and Bath opens, using Brunel's broad gauge and associated masonry structures.

Brunel, Isambard Kingdom · Bristol
1840, August 31 — Bristol Temple Meads Opens

Opens his original Bristol Temple Meads terminus.

Brunel, Isambard Kingdom · Bristol
1840, August 31 — Original Bristol Terminus

Trains begin running from Brunel's Bristol station toward Bath.

Brunel, Isambard Kingdom · Bristol
1840, September 13 — Swindon Railway Works

Daniel Gooch proposes locomotive works at Swindon and Brunel supports creation of a major railway centre there.

Brunel, Isambard Kingdom · Swindon
1840, October 10 — Screw Propulsion Report Submitted

Brunel submits a detailed report recommending screw propulsion instead of paddle wheels for the new Great Britain.

Brunel, Isambard Kingdom · Bristol
1840, December — SS Great Britain

Brunel orders SS Great Britain to be redesigned for screw propulsion instead of paddle wheels.

Brunel, Isambard Kingdom · Bristol
1840, December 17 — Wootton Bassett-Chippenham Section Opens

Another section of Brunel's Great Western main line opens between Wootton Bassett and Chippenham.

Brunel, Isambard Kingdom · Wiltshire
1841 — Bath Railway Footbridge

The structure becomes a surviving element of Brunel's original railway.

Brunel, Isambard Kingdom · Bath
1841 — Box Tunnel West Portal Architecture Completed

The western entrance is finished with a more elaborate architectural treatment than the simpler eastern portal.

Brunel, Isambard Kingdom · Box Hill
1841 — Box Tunnel Workforce Expanded

Brunel pushes the main contractor to increase the Box Tunnel workforce from about twelve hundred to four thousand men.

Brunel, Isambard Kingdom · Box Hill
1841 — Chippenham GWR Crossing

The viaduct opens with the completed Great Western route.

Brunel, Isambard Kingdom · Chippenham
1841 — Chippenham Railway Viaduct

Completes the principal railway viaduct at Chippenham.

Brunel, Isambard Kingdom · Chippenham
1841 — Chippenham Viaduct Opens

Brunel's railway viaduct at Chippenham opens with the completed Great Western route.

Brunel, Isambard Kingdom · Chippenham
1841 — Great Western Main Line Reaches 116 Miles

The completed London-to-Bristol main line extends roughly 116 miles and embodies Brunel's integrated railway design.

Brunel, Isambard Kingdom · England
1841 — Quaker's Yard Viaduct

Completes the Quaker's Yard viaduct for the Taff Vale Railway.

Brunel, Isambard Kingdom · Quaker's Yard
1841 — Sydney Gardens Footbridge

Completes a railway footbridge through Sydney Gardens in Bath.

Brunel, Isambard Kingdom · Bath
1841 — Taff Vale Viaduct Completed

The crossing supports rail access for the South Wales iron industry.

Brunel, Isambard Kingdom · Quaker's Yard
1841 — Bath London Through Services Established

Completion of the remaining main line made uninterrupted railway journeys possible between Bath and London.

Brunel, Isambard Kingdom · Bath Avon
1841 — Box Tunnel Links Bath To East

Opening the Box Tunnel completed the route through the hills east of Bath and connected the Avon valley to Chippenham.

Brunel, Isambard Kingdom · Bath Avon
1841 — Bath Spa Rail Connectivity Expands

The fully connected Great Western route improved Bath's access to London and Bristol by rail.

Brunel, Isambard Kingdom · Bath Avon
1841 — Avon Railway Crossing Carries Through Traffic

The new route's masonry structures supported regular broad gauge passenger and goods trains through the Avon valley.

Brunel, Isambard Kingdom · Bath Avon
1841 — Bath To Chippenham Railway Connection Opens

The completion of the eastern section established a continuous railway journey from Bath toward Chippenham.

Brunel, Isambard Kingdom · Bath Avon
1841 — Bath Stone Railway Engineering Showcased

Masonry work on the railway integrated bridges and station buildings with the region's Bath stone architectural tradition.

Brunel, Isambard Kingdom · Bath Avon
1841 — Bath Tunnel Approaches Enter Service

The railway approaches toward Box Tunnel carried trains eastward from Bath on the completed main line.

Brunel, Isambard Kingdom · Bath Avon
1841 — Chippenham Avon Viaduct Carries Trains

The viaduct carried regular railway traffic once the completed Great Western route opened through the town.

Brunel, Isambard Kingdom · Chippenham GWR
1841 — Chippenham Box Tunnel Link Established

Opening the long Box Tunnel connected Chippenham by rail with Bath and the Bristol section beyond.

Brunel, Isambard Kingdom · Chippenham GWR
1841 — Chippenham Bristol Through Route Opens

Passengers could travel directly from Chippenham to Bristol following completion of the main line.

Brunel, Isambard Kingdom · Chippenham GWR
1841 — Chippenham London Through Route Established

The completed Great Western line enabled a continuous railway journey between Chippenham and Paddington.

Brunel, Isambard Kingdom · Chippenham GWR
1841 — Wiltshire Main Line Engineering Completed

Brunel's completion of the missing Wiltshire works joined the separately operating sections of the railway.

Brunel, Isambard Kingdom · Chippenham GWR
1841 — Chippenham Becomes Intermediate Railway Station

The town ceased to be a temporary terminus and became a through station on the London to Bristol main line.

Brunel, Isambard Kingdom · Chippenham GWR
1841 — Chippenham Rail Bridge Clearances Established

The route's bridges and structures reflected the generous clearances adopted for Brunel's broad gauge trains.

Brunel, Isambard Kingdom · Chippenham GWR
1841 — Clifton Suspension Tower Building Continues

Stone towers rose above the gorge while work on abutments and chain anchorage structures proceeded.

Brunel, Isambard Kingdom · Clifton Bridge
1841 — Hungerford Bridge Foundations Constructed

Work progressed on the foundations and river supports needed for the Thames pedestrian suspension bridge.

Brunel, Isambard Kingdom · Hungerford
1841 — Cunard Advances Westbound Crossing Standard

Great Western faced faster rival services as Cunard's Columbia displaced her earlier westbound crossing benchmark.

Hosken, James · Atlantic Ocean
1841 — October Bristol Sailing Advertised

A surviving sailing notice advertised a Great Western departure from Bristol in October 1841 under Captain Hosken.

Hosken, James · Bristol
1841 — Passenger Notices Specify Cabin Charges

The company's 1841 advertising offered specified cabin fares and separate charges for some passengers and animals.

Hosken, James · Bristol
1841, March 24 — Knighthood

Queen Victoria knights Marc Isambard Brunel in recognition of his engineering work and the approaching completion of the Thames Tunnel.

Brunel, Marc Isambard · London
1841, April — Box Tunnel

The opposing tunnel workings meet with an alignment error of less than two inches and construction is completed.

Brunel, Isambard Kingdom · Box Hill
1841, June 30 — Box Tunnel

Box Tunnel opens as the longest railway tunnel in the world at the time.

Brunel, Isambard Kingdom · Box Hill
1841, June 30 — Great Western Railway

The complete Great Western Railway route between London and Bristol opens for through services.

Brunel, Isambard Kingdom · Bristol
1841, June 30 — London-Bristol Through Journey Established

Completion of the main line allows continuous railway travel between London and Bristol in about four hours.

Brunel, Isambard Kingdom · Great Western Railway
1841, November — Thames Tunnel

Excavation reaches the Wapping side and the main tunnelling work beneath the Thames is completed.

Brunel, Marc Isambard · Wapping
1842 — Final Thames Tunnel Excavation Completed

The principal excavation beneath the Thames reaches completion, leaving finishing work before the pedestrian tunnel can open.

Brunel, Marc Isambard · Wapping
1842 — HMS Rattler

Brunel assists the Royal Navy in fitting HMS Rattler with screw propulsion and suitable engines.

Brunel, Isambard Kingdom · England
1842 — Clifton Anchor Tunnels Completed

The bridge towers, abutments and four anchor tunnels are substantially completed before the project again runs short of money.

Brunel, Isambard Kingdom · Bristol
1842 — Great Britain Chain-Drive Machinery Developed

The ship's machinery uses a large chain drive to transmit engine power to the screw propeller.

Brunel, Isambard Kingdom · Bristol
1842 — South Entrance Lock Enlargement Begins

Work began on rebuilding the southern Cumberland Basin entrance to admit larger vessels using Bristol's port.

Brunel, Isambard Kingdom · Bristol Docks
1842 — Avon Valley Goods Traffic Develops

The Great Western Railway offered merchants a more direct land transport route for goods moving through the Bath area.

Brunel, Isambard Kingdom · Bath Avon
1842 — Clifton Tower And Anchorage Works Finished

The towers abutments and principal anchor tunnels had been substantially completed by 1842.

Brunel, Isambard Kingdom · Clifton Bridge
1842 — Hungerford Stone Towers Under Construction

Masonry towers were built to support the suspension chains and the elevated pedestrian deck.

Brunel, Isambard Kingdom · Hungerford
1842 — Atlantic Route Adapts To Port Demand

The steamship's use of Liverpool as well as Bristol reflected the changing commercial geography of Atlantic passenger traffic.

Hosken, James · Liverpool
1842 — May Voyage Sets Eastbound Speed Record

Great Western reclaimed a leading eastbound Atlantic crossing time in May 1842.

Hosken, James · Atlantic Ocean
1842 — Western Uses Liverpool As Alternate Port

Great Western began alternating her British terminus between Bristol and Liverpool during 1842.

Hosken, James · Liverpool
1842 — Four Chain Anchor Tunnels Completed

Work on the original Clifton bridge scheme produces four anchorage tunnels by 1842, alongside the towers and abutments intended to secure the proposed iron chains.

Brunel, Isambard Kingdom · Bristol
1842 — Original Piers And Abutments Stand Ready

The principal stone piers and abutments of Brunel's original design are substantially complete by 1842, despite the continued absence of a suspended roadway.

Brunel, Isambard Kingdom · Avon Gorge
1843 — Clifton Suspension Bridge

Funds are exhausted and construction stops before the chains and roadway can be completed.

Brunel, Isambard Kingdom · Bristol
1843 — Clifton Ironwork Funding Shortfall

Construction stalls because the bridge company lacks the funds needed to complete the chains and roadway.

Brunel, Isambard Kingdom · Bristol
1843 — Great Britain Six-Masted Rig Completed

SS Great Britain is equipped with a six-masted schooner rig designed to reduce the sailing manpower required.

Brunel, Isambard Kingdom · Bristol
1843 — South Devon Railway Route Survey Reused

Earlier survey work by Brunel helps shape plans for extending broad-gauge railway communication from Exeter toward Plymouth.

Brunel, Isambard Kingdom · Devon
1843 — Wrought Iron Caisson Lock Designed

Brunel developed a large wrought iron caisson arrangement to increase the usable length of the improved entrance lock.

Brunel, Isambard Kingdom · Bristol Docks
1843 — Bath Railway Operations Consolidate

The Bath section became part of the established London to Bristol route serving passengers and freight.

Brunel, Isambard Kingdom · Bath Avon
1843 — Clifton Bridge Funds Run Short

Construction slowed dramatically when available capital proved insufficient to complete the deck and ironwork.

Brunel, Isambard Kingdom · Clifton Bridge
1843 — Hungerford Bridge Suspension Chains Assembled

Workers installed or prepared the massive iron links required to suspend the bridge across the river.

Brunel, Isambard Kingdom · Hungerford
1843 — Liverpool Becomes Main Western Terminus

From 1843 Great Western operated her North Atlantic voyages primarily from Liverpool rather than Bristol.

Hosken, James · Liverpool
1843 — Lloyds Underwriters Honour Captain Hosken

Lloyd's underwriters gave Captain Hosken a gold watch in recognition of his safe navigation of many Atlantic passages aboard Great Western.

Hosken, James · London
1843 — May Westbound Passage Wins New Record

Great Western briefly regained a leading westbound Atlantic passage record during May 1843.

Hosken, James · New York
1843 — Remaining Ironwork Needs Additional Finance

With the masonry largely finished, the Clifton bridge project still requires roughly thirty thousand pounds for remaining ironwork, a shortfall that prevents completion of the crossing.

Brunel, Isambard Kingdom · Bristol
1843, January 2 — Swindon Railway Works

The Great Western Railway works open at New Swindon and become a major centre for locomotive engineering.

Brunel, Isambard Kingdom · Swindon
1843, March 25 — Thames Tunnel

The Thames Tunnel opens to pedestrians after eighteen years of construction begun under Marc and Isambard Brunel.

Brunel, Isambard Kingdom · London
1843, March 25 — Thames Tunnel

The Thames Tunnel opens to the public as the first successful tunnel beneath a navigable river.

Brunel, Marc Isambard · Rotherhithe
1843, April 3 — Medical Emergency

Brunel accidentally inhales a half-sovereign coin and later designs equipment to help remove it.

Brunel, Isambard Kingdom · London
1843, July 19 — SS Great Britain

SS Great Britain is launched as the largest ship in the world and a pioneering iron screw steamship.

Brunel, Isambard Kingdom · Bristol
1843, July 19 — Prince Albert Attends Great Britain Launch

Prince Albert attends the public launch of SS Great Britain in Bristol's Floating Harbour.

Brunel, Isambard Kingdom · Bristol
1844 — Atmospheric Traction Recommended to South Devon

Brunel recommends atmospheric propulsion for the South Devon Railway, expecting savings and greater freedom in gradients and curves.

Brunel, Isambard Kingdom · Devon
1844 — Brunel Lock Chamber Reconfigured

The rebuilt southern entrance was planned to accommodate larger steamships than the earlier Bristol dock entrance.

Brunel, Isambard Kingdom · Bristol Docks
1844 — Hungerford Bridge Deck Construction Advances

Construction progressed on the walkway suspended from the large iron chains over the Thames.

Brunel, Isambard Kingdom · Hungerford
1844, March — SS Great Britain

SS Great Britain is completed for service but remains delayed by limitations in Bristol Harbour.

Brunel, Isambard Kingdom · Bristol
1844, July 4 — South Devon Railway Act Secured

Parliament authorises the South Devon Railway, enabling Brunel's route from Exeter toward Plymouth to proceed.

Brunel, Isambard Kingdom · Devon
1844, December — SS Great Britain

SS Great Britain finally leaves Bristol Floating Harbour after modifications are made to the harbour locks.

Brunel, Isambard Kingdom · Bristol
1845 — Institution of Civil Engineers

Brunel is elected to the council of the Institution of Civil Engineers.

Brunel, Isambard Kingdom · London
1845 — Atmospheric Pumping Machinery Contracted

Contracts are placed for stationary engines and equipment needed to operate Brunel's atmospheric railway system.

Brunel, Isambard Kingdom · Devon
1845 — Hungerford Bridge Completed

Its chains are later reused to complete the Clifton Suspension Bridge.

Brunel, Isambard Kingdom · London
1845 — Hungerford Suspension Bridge

Completes the Hungerford Suspension Bridge across the Thames.

Brunel, Isambard Kingdom · London
1845 — Single Leaf Lock Closure Developed

Brunel's entrance lock adopted an innovative single leaf caisson closure that maximised usable chamber dimensions.

Brunel, Isambard Kingdom · Bristol Docks
1845 — Avon Corridor Railway Capacity Increases

Additional operations made the Avon valley an important through corridor in the Great Western system.

Brunel, Isambard Kingdom · Bath Avon
1845 — Clifton Bridge Remains Unfinished

The bridge's standing towers showed the project's progress but the span still lacked its suspended roadway.

Brunel, Isambard Kingdom · Clifton Bridge
1845 — Hungerford Thames Footbridge Opens

Brunel's suspension bridge opened for pedestrians between Hungerford Market and the southern Thames bank.

Brunel, Isambard Kingdom · Hungerford
1845 — Hungerford Bridge Pedestrian Toll Introduced

Users of the new crossing paid tolls to travel across Brunel's suspended Thames walkway.

Brunel, Isambard Kingdom · Hungerford
1845 — Hungerford Bridge South Bank Access Established

The bridge improved pedestrian access across the Thames between the market district and the south bank.

Brunel, Isambard Kingdom · Hungerford
1845 — Return Crossing Loses Propeller Blades

SS Great Britain lost propeller blades during her first homeward Atlantic passage and relied on sail power to return to Liverpool.

Brunel, Isambard Kingdom · Atlantic Ocean
1845, July — SS Great Britain

SS Great Britain is completed and prepared for transatlantic passenger service.

Brunel, Isambard Kingdom · Liverpool
1845, July 26 — SS Great Britain

SS Great Britain departs Liverpool for New York on her first transatlantic voyage.

Brunel, Isambard Kingdom · Liverpool
1845, August — SS Great Britain

SS Great Britain reaches New York after becoming the first iron steamship to cross the Atlantic Ocean.

Brunel, Isambard Kingdom · New York
1845, August 8 — Great Britain First New York Arrival

The ship designed by Brunel reached New York on its inaugural Atlantic passage after departing Liverpool in July.

Brunel, Isambard Kingdom · New York
1845, September 1 — Great Britain First Westbound Return

The new screw steamship departed New York for Liverpool on its first homeward passenger voyage.

Brunel, Isambard Kingdom · New York
1845, September 15 — First Atlantic Return Reaches Liverpool

Great Britain completed its inaugural return crossing and arrived in Liverpool after sailing from New York.

Brunel, Isambard Kingdom · Liverpool
1845, September 27 — Second New York Departure Begins

Great Britain began another westbound service when it left Liverpool for New York in late September.

Brunel, Isambard Kingdom · Liverpool
1845, October 15 — Second Atlantic Arrival Recorded

Great Britain reached New York on its second westbound commercial voyage of the year.

Brunel, Isambard Kingdom · New York
1845, October 30 — Autumn Return Crossing Departs

The steamship sailed from New York for Liverpool on a further return crossing with a small passenger complement.

Brunel, Isambard Kingdom · New York
1845, November 16 — Autumn Atlantic Crossing Ends

Great Britain arrived back at Liverpool after the late October departure from New York.

Brunel, Isambard Kingdom · Liverpool
1846 — Gauge War

Brunel defends the Great Western broad gauge as Parliament regulates the gauges permitted on future railways.

Brunel, Isambard Kingdom · London
1846 — SS Great Britain

SS Great Britain completes two transatlantic round trips during her second season of passenger service.

Brunel, Isambard Kingdom · Atlantic Ocean
1846 — Steamship Company Faces Financial Pressure

The owners faced acute financial strain in connection with the stranding of their other steamship Great Britain.

Brunel, Isambard Kingdom · Bristol
1846 — Great Western Ends North Atlantic Service

Great Western was withdrawn from her original North Atlantic operation after the 1846 season.

Hosken, James · Liverpool
1846, May 9 — May Atlantic Sailing Commences

Great Britain sailed west from Liverpool in May on another scheduled crossing to New York.

Brunel, Isambard Kingdom · Liverpool
1846, May 30 — Exeter-Teignmouth Steam Service Opens

The first South Devon section opens with conventional locomotives while the atmospheric equipment is still being installed.

Brunel, Isambard Kingdom · Teignmouth
1846, May 30 — May Crossing Ends In New York

Great Britain arrived at New York after its spring voyage from Liverpool.

Brunel, Isambard Kingdom · New York
1846, June 10 — June Homeward Passage Starts

The ship embarked on a June homeward crossing from New York to Liverpool.

Brunel, Isambard Kingdom · New York
1846, June 22 — June Return Reaches Liverpool

Great Britain completed its June Atlantic return and reached Liverpool.

Brunel, Isambard Kingdom · Liverpool
1846, July 7 — July Atlantic Departure Takes Place

Great Britain departed Liverpool on another scheduled westbound voyage during July.

Brunel, Isambard Kingdom · Liverpool
1846, July 22 — July Service Arrives New York

Great Britain reached New York on its July voyage while still operating on the North Atlantic route.

Brunel, Isambard Kingdom · New York
1846, September 22 — SS Great Britain

SS Great Britain runs aground in Dundrum Bay during a transatlantic voyage.

Brunel, Isambard Kingdom · Dundrum Bay
1846, December 30 — South Devon Line Reaches Newton

The South Devon Railway extends from Teignmouth to Newton while Brunel continues preparing atmospheric traction.

Brunel, Isambard Kingdom · Newton Abbot
1847 — Bremner Undertakes Dundrum Salvage

Scottish engineer James Bremner undertook the demanding salvage of SS Great Britain after her grounding in Dundrum Bay.

Bremner, James · Dundrum Bay
1847 — Salvage Work Restores Hull Buoyancy

James Bremner arranged the measures needed to recover the stranded iron steamship from the sands of Dundrum Bay.

Bremner, James · Dundrum Bay
1847 — Great Western Sold To Royal Mail

The Great Western Steamship Company sold its original paddle steamer to the Royal Mail Steam Packet Company in April 1847.

Brunel, Isambard Kingdom · Liverpool
1847 — Western Reassigned To Caribbean Service

After the sale, Great Western entered Royal Mail Steam Packet Company service linking Britain with the West Indies.

Brunel, Isambard Kingdom · Southampton
1847, February 25 — First Atmospheric Piston Carriage Tested

The first piston carriage is delivered and makes an initial atmospheric test run from Exeter.

Brunel, Isambard Kingdom · Exeter
1847, February 26 — Brunel and Samuda Atmospheric Trial

Brunel and Jacob Samuda take part in an early test journey that exposes weaknesses in pumps and traction pipes.

Brunel, Isambard Kingdom · Devon
1847, August 18 — Atmospheric Goods Train Demonstration

An atmospheric-powered train hauls eleven goods wagons on the South Devon Railway during experimental running.

Brunel, Isambard Kingdom · Devon
1847, August 25 — SS Great Britain

SS Great Britain is refloated after remaining stranded in Dundrum Bay for nearly a year.

Brunel, Isambard Kingdom · Dundrum Bay
1847, September 13 — Atmospheric Railway

Brunel's atmospheric railway opens to Teignmouth using stationary engines and vacuum pipes for propulsion.

Brunel, Isambard Kingdom · Teignmouth
1847, September 13 — Public Atmospheric Service to Teignmouth

Regular passenger services begin using atmospheric propulsion between Exeter and Teignmouth.

Brunel, Isambard Kingdom · Teignmouth
1848 — Fifteen-Inch Atmospheric Pipe Used

The relatively level Exeter-to-Newton section uses fifteen-inch traction pipes to propel atmospheric trains.

Brunel, Isambard Kingdom · Devon
1848 — Ivybridge Timber Viaduct Opens

A Brunel-designed viaduct opens on the South Devon route as part of the extension toward Plymouth.

Brunel, Isambard Kingdom · Ivybridge
1848 — Larger Atmospheric Pipes Planned for South Devon Banks

Brunel plans larger traction pipes for the steeper section beyond Newton where greater pulling force is required.

Brunel, Isambard Kingdom · Devon
1848 — Plymbridge Road Overbridge Completed

A Brunel-designed elliptical railway overbridge is completed for the South Devon Railway near Plympton.

Brunel, Isambard Kingdom · Plympton
1848 — Tamar Bridge Preliminary Works Begin

Early work begins on Brunel's proposed railway crossing of the River Tamar before the project is later restarted.

Brunel, Isambard Kingdom · Saltash
1848, January 10 — Atmospheric Railway

Atmospheric railway services reach Newton Abbot as Brunel continues testing the experimental system.

Brunel, Isambard Kingdom · Newton Abbot
1848, January 10 — Atmospheric Service Extended to Newton

Atmospheric passenger working extends from Teignmouth to Newton on Brunel's South Devon system.

Brunel, Isambard Kingdom · Newton Abbot
1848, February 23 — Entire Exeter-Newton Timetable Goes Atmospheric

All scheduled trains between Exeter and Newton temporarily operate using Brunel's atmospheric traction system.

Brunel, Isambard Kingdom · Devon
1848, April 26 — Royal Albert Bridge

Brunel launches a survey cylinder into the River Tamar to investigate foundations for the future bridge.

Brunel, Isambard Kingdom · Saltash
1848, September 10 — Atmospheric Railway

The atmospheric railway closes after persistent leakage and high maintenance costs make it impractical.

Brunel, Isambard Kingdom · Devon
1848, September 10 — Atmospheric Working Abandoned

Persistent leakage, unreliable equipment and high operating costs lead to abandonment of atmospheric traction on the South Devon Railway.

Brunel, Isambard Kingdom · Devon
1849 — Bristol Swing Bridge Construction

Designs a wrought-iron swing bridge for Bristol Harbour.

Brunel, Isambard Kingdom · Bristol
1849 — Chepstow Rail Bridge Construction

Begins work on the railway bridge across the River Wye at Chepstow.

Brunel, Isambard Kingdom · Chepstow
1849 — Chepstow Tubular Pier System Developed

Brunel develops tubular iron supports for the railway crossing of the River Wye at Chepstow.

Brunel, Isambard Kingdom · Chepstow
1849 — North Entrance Lock Bridge

The bridge forms part of Brunel's improvements to the entrance locks.

Brunel, Isambard Kingdom · Bristol
1849 — Windsor Railway Bridge

Designs the wrought-iron railway bridge carrying the Windsor branch over the Thames.

Brunel, Isambard Kingdom · Windsor
1849 — Windsor Thames Bridge Bowstring Design

Brunel develops a wrought-iron bow-and-string railway crossing over the Thames for the Windsor branch.

Brunel, Isambard Kingdom · Windsor
1849 — Windsor-Slough Thames Crossing

The bow-and-string design anticipates later work at Saltash.

Brunel, Isambard Kingdom · Windsor
1849 — Wye Bridge Works Begin

The tubular design influences Brunel's later Royal Albert Bridge.

Brunel, Isambard Kingdom · Chepstow
1849 — Dock Swing Bridge Design Finalised

Brunel substituted a wrought iron swing bridge for the rolling bridge originally considered for the improved entrance lock.

Brunel, Isambard Kingdom · Bristol Docks
1849, December 12 — Death of Marc Brunel

Brunel's father and engineering mentor Marc Isambard Brunel dies.

Brunel, Isambard Kingdom · London
1849, December 12 — Death of Marc Isambard Brunel

Sir Marc Isambard Brunel dies in Westminster after a career in civil and mechanical engineering.

Brunel, Marc Isambard · Westminster
1850 — Brunel Swivel Bridge

The Brunel Swivel Bridge is completed as part of improvements to the locks at Bristol Harbour.

Brunel, Isambard Kingdom · Bristol
1850 — Institution of Civil Engineers

Brunel becomes a vice-president of the Institution of Civil Engineers.

Brunel, Isambard Kingdom · London
1850 — Swivel Bridge Completed At Docks

Brunel's swivelling iron bridge was completed over the entrance lock at Cumberland Basin during the autumn.

Brunel, Isambard Kingdom · Bristol Docks
1850 — South Entrance Navigation Improved

The enlarged entrance and its new bridge provided more practical access for the growing steamship traffic at Bristol.

Brunel, Isambard Kingdom · Bristol Docks
1850 — Great Britain Sold For Australian Service

The former Atlantic liner was sold to new interests for a change of service toward Australian passenger voyages.

Brunel, Isambard Kingdom · Liverpool
1850 — Dundrum Salvage Expense Undermines Original Company

The cost of recovering SS Great Britain after her 1846 grounding placed severe financial pressure on the original Great Western Steamship Company.

Brunel, Isambard Kingdom · Liverpool
1850 — Great Britain Sold For Australian Service

Gibbs Bright and Company bought SS Great Britain in 1850 and prepared the former Atlantic steamship for the growing Australia emigrant trade.

Brunel, Isambard Kingdom · Liverpool
1851 — Clifton Chains Diverted from Original Project

Material intended for the unfinished Clifton bridge is disposed of after the project loses its remaining construction funds.

Brunel, Isambard Kingdom · Bristol
1851 — Clifton Materials Ordered Sold

Brunel is ordered to suspend the unfinished bridge works and sell materials and plant to satisfy creditors.

Brunel, Isambard Kingdom · Bristol
1851 — Clifton Construction Suspension Ordered

Financial problems forced the project's managers to halt work and seek ways to settle outstanding liabilities.

Brunel, Isambard Kingdom · Clifton Bridge
1851 — Permanent Paddington Station Plans Presented

Brunel prepared a scheme for replacing the temporary terminus with a monumental iron roofed passenger station.

Brunel, Isambard Kingdom · Paddington
1851 — Australian Passenger Refit Prepared

The ship underwent substantial preparation to serve the growing demand for passage to Australia.

Brunel, Isambard Kingdom · Liverpool
1851 — Australian Refit Enlarges Ship Deckhouse

Refitting SS Great Britain for the emigrant trade included a substantial deckhouse that provided more accommodation for long voyages.

Brunel, Isambard Kingdom · Liverpool
1851 — Brunel Ordered To Sell Bridge Materials

Creditors direct Brunel to halt remaining Clifton bridge work and dispose of materials and plant in October 1851 as the undertaking struggles with its unpaid obligations.

Brunel, Isambard Kingdom · Bristol
1851, January 2 — Paddington Station

Brunel presents preliminary plans for rebuilding Paddington as a grand permanent railway terminus.

Brunel, Isambard Kingdom · Paddington Station
1851, July 17 — Mickleton Tunnel Contract Dispute Escalates

Brunel arrives with a large workforce during a bitter contractor dispute at Mickleton Tunnel, prompting local magistrates to intervene.

Brunel, Isambard Kingdom · Mickleton
1852 — Chepstow Railway Bridge

Brunel completes the tubular railway bridge over the River Wye at Chepstow.

Brunel, Isambard Kingdom · Chepstow
1852 — SS Great Eastern

Brunel develops the concept of an exceptionally large steamship able to reach distant destinations without refuelling.

Brunel, Isambard Kingdom · London
1852 — Chepstow Approach Plate Girders Used

Brunel employs wrought-iron plate girders for approach spans and decking at the Chepstow railway bridge.

Brunel, Isambard Kingdom · Chepstow
1852 — Chepstow Inverted-W Main Girder Completed

The Chepstow railway bridge uses Brunel's distinctive large inverted-W tubular girder over the River Wye.

Brunel, Isambard Kingdom · Chepstow
1852 — Great Eastern Long-Range Concept Developed

Brunel develops a huge steamship intended to reach distant destinations without repeatedly stopping to take on coal.

Brunel, Isambard Kingdom · London
1852 — Great Eastern Ocean Liner Concept Proposed

Brunel developed plans for a steamship large enough to travel immense distances without frequent coaling stops.

Brunel, Isambard Kingdom · Great Eastern
1852 — Australian Passenger Capacity Expanded

The ship was fitted to accommodate substantially more travellers for its long voyages to Australia.

Brunel, Isambard Kingdom · Liverpool
1852 — Retractable Propeller Fitted For Sailing

The Australian refit incorporated a propeller that could be raised to reduce resistance when sailing under wind power.

Brunel, Isambard Kingdom · Liverpool
1852 — Three Mast Square Rig Installed

The former transatlantic liner received a three masted sailing arrangement suited to its longer Australian service.

Brunel, Isambard Kingdom · Liverpool
1852 — Australian Passenger Capacity Expanded

During the 1851 to 1852 conversion SS Great Britain gained passenger accommodation for roughly 730 travellers serving the Australian emigrant route.

Brunel, Isambard Kingdom · Liverpool
1852 — Retractable Propeller Fitted For Sailing

SS Great Britain was adapted to combine steam with ocean sailing, allowing her propeller arrangement to reduce resistance when winds were favourable.

Brunel, Isambard Kingdom · Liverpool
1852 — First Australian Voyage Carries Emigrants

SS Great Britain carried hundreds of emigrants to Victoria during her first Australia voyage as demand surged following the gold discoveries.

Gray, John · Melbourne
1852 — Gray Joins Ship As Second Officer

John Gray joined SS Great Britain as second officer in time for her first voyage to Australia.

Gray, John · Liverpool
1852 — Great Britain Calls For Coal At Saint Helena

During the first Australia voyage SS Great Britain turned back towards Saint Helena to replenish coal after fuel consumption proved greater than expected.

Gray, John · Saint Helena
1852 — Melbourne Visitors Tour Great Britain

Thousands of curious visitors paid to inspect the newly arrived steamship during its first Australian visit.

Gray, John · Melbourne
1852, August 21 — First Australian Voyage Leaves Liverpool

Great Britain departed Liverpool for Melbourne carrying emigrants and other passengers during the Australian gold rush.

Gray, John · Liverpool
1852, October 1 — Snow Hill Station

The Great Western Railway opens its Birmingham station at Snow Hill.

Brunel, Isambard Kingdom · Snow Hill Staion
1852, November 12 — Australian Liner Reaches Melbourne

Great Britain reached Melbourne after a long voyage carrying hundreds of people from Liverpool.

Gray, John · Melbourne
1853 — Paddington Station

Brunel designs the permanent station with architectural detailing undertaken by Matthew Digby Wyatt.

Brunel, Isambard Kingdom · London
1853 — Royal Albert Bridge

Brunel finalises the distinctive lenticular truss design for the railway bridge across the River Tamar.

Brunel, Isambard Kingdom · Saltash
1853 — Great Eastern Combined Paddle and Screw Propulsion

The Great Eastern is designed with both paddle wheels and a screw propeller driven by separate machinery.

Brunel, Isambard Kingdom · London
1853 — Great Eastern Double-Hull Principle Adopted

Brunel's Great Eastern design uses a double iron hull to provide exceptional structural strength and internal subdivision.

Brunel, Isambard Kingdom · London
1853 — South Wales Railway Network Integration

Brunel's broad-gauge engineering links major South Wales industrial routes with the wider Great Western system.

Brunel, Isambard Kingdom · South Wales
1853 — Clifton Bridge Plant Sold

Project materials and equipment were sold as the original construction effort came to an end.

Brunel, Isambard Kingdom · Clifton Bridge
1853 — Clifton Bridge Original Project Abandoned

The first construction programme stopped without completion of the bridge across the gorge.

Brunel, Isambard Kingdom · Clifton Bridge
1853 — Great Eastern Twin Propulsion Designed

Brunel specified both side paddle wheels and a screw propeller to power his exceptionally large iron steamship.

Brunel, Isambard Kingdom · Great Eastern
1853 — Great Eastern Double Hull Specified

The vessel's structural scheme used a cellular double iron hull to increase strength and resistance to damage.

Brunel, Isambard Kingdom · Great Eastern
1853 — Paddington Iron Roof Structure Assembled

The new station's broad train shed incorporated extensive wrought iron supports and glazed roof areas.

Brunel, Isambard Kingdom · Paddington
1853 — Two Blade Propeller Installed During Refit

A refit of SS Great Britain after her first voyage to Australia included installation of a two blade screw propeller and changes to her sailing rig.

Brunel, Isambard Kingdom · Liverpool
1853 — Gray Promoted To First Officer

John Gray advanced to first officer aboard SS Great Britain during her early Australian passenger service.

Gray, John · Liverpool
1853 — Long Distance Steam Sailing Demonstrated

Great Britain continued Australian passenger service by combining engine power with sail on lengthy ocean routes.

Gray, John · Melbourne
1853 — Ship Receives Revised Square Rig

An Australian service refit altered SS Great Britain to three square rigged masts to improve economical ocean sailing.

Gray, John · Liverpool
1853 — Unused Clifton Ironwork Redirected To Saltash

Iron chains originally acquired for the unfinished Clifton project are sold and subsequently used in Brunel's Royal Albert Bridge at Saltash after funding for Clifton collapses.

Brunel, Isambard Kingdom · Bristol
1853, February — Paddington Station

The Great Western Railway approves Brunel's plans for a grand permanent terminus at Paddington.

Brunel, Isambard Kingdom · London
1853, July — Clifton Bridge Works Abandoned

Construction of the Clifton Suspension Bridge is completely abandoned.

Brunel, Isambard Kingdom · Bristol
1853, July — Clifton Construction Suspended

The unfinished project remains dormant when its statutory time limit expires.

Brunel, Isambard Kingdom · Bristol
1853, July 4 — Cornish Pier Foundation Ceremony

The foundation for a Cornish-side pier of the Royal Albert Bridge is formally laid at Saltash.

Brunel, Isambard Kingdom · Saltash
1854 — Floating Gun Batteries

Brunel submits designs for floating gun batteries intended for use during the Crimean War.

Brunel, Isambard Kingdom · London
1854 — Great Eastern Side-Launch Method Planned

Because of the ship's enormous length and the narrow Thames, Brunel plans to launch Great Eastern sideways.

Brunel, Isambard Kingdom · Millwall
1854 — Royal Albert Bridge Works Restarted

Major construction restarts on the Tamar railway bridge after the earlier preliminary phase.

Brunel, Isambard Kingdom · Saltash
1854 — Great Eastern Side Launch Planned

Brunel chose a sideways launching system because the vessel was too long for a conventional end launch into the Thames.

Brunel, Isambard Kingdom · Great Eastern
1854 — Paddington New Train Shed Enters Service

Brunel's permanent station began handling railway services as work on its great roof continued.

Brunel, Isambard Kingdom · Paddington
1854 — Gray Takes Command Of Great Britain

John Gray became captain of SS Great Britain in April 1854 and began a long command spanning Australian and military voyages.

Gray, John · Liverpool
1854 — Troopship Conversion For Crimea Planned

Great Britain was selected for conversion from emigrant transport into a troop carrier during the Crimean War.

Gray, John · Great Britain
1854, January 16 — Paddington Station

The first Great Western Railway service departs from Brunel's new Paddington Station before completion of the roof.

Brunel, Isambard Kingdom · London
1854, May — Royal Albert Bridge

Construction begins on Brunel's Royal Albert Bridge across the River Tamar between Devon and Cornwall.

Brunel, Isambard Kingdom · Saltash
1854, May 1 — SS Great Eastern

The keel of SS Great Eastern is laid at John Scott Russell's shipyard in Millwall.

Brunel, Isambard Kingdom · Millwall
1854, May 29 — Paddington Station

Brunel's permanent Paddington Station formally opens with a three-span wrought-iron and glazed train shed.

Brunel, Isambard Kingdom · London
1855 — Great Eastern Five-Funnel Arrangement Developed

The giant steamship is designed with five funnels serving its extensive steam machinery.

Brunel, Isambard Kingdom · Millwall
1855 — Renkioi Bathing and Sanitary Facilities Planned

The modular wards include dedicated washing, bathing and sanitary facilities rather than relying on improvised arrangements.

Brunel, Isambard Kingdom · London
1855 — Renkioi Drainage Network Designed

Brunel incorporates systematic drainage and sewerage into the hospital plan to improve sanitation.

Brunel, Isambard Kingdom · London
1855 — Renkioi Fifty-Bed Ward Module Designed

Brunel develops a standard hospital unit divided into two twenty-five-bed wards for rapid prefabricated construction.

Brunel, Isambard Kingdom · London
1855 — Renkioi Hospital Components Prefabricated in Britain

Standardised timber and iron components are manufactured in Britain for shipment to the Dardanelles site.

Brunel, Isambard Kingdom · Great Britain
1855 — Renkioi Jetty-to-Hospital Railway Planned

A small railway is incorporated into the site plan to move stores and patients from the landing jetty toward the hospital.

Brunel, Isambard Kingdom · Renkioi
1855 — Renkioi Kitchens Integrated with Ward Ranges

Purpose-built kitchens are positioned to serve groups of hospital wards efficiently.

Brunel, Isambard Kingdom · Renkioi
1855 — Renkioi Laundries Integrated with Sanitation System

Dedicated laundries are included in the prefabricated complex and connected with the hospital's drainage arrangements.

Brunel, Isambard Kingdom · Renkioi
1855 — Renkioi Modular Expansion Planned

Brunel's prefabricated layout allows the hospital to expand rapidly as additional ward buildings are shipped and assembled.

Brunel, Isambard Kingdom · London
1855 — Renkioi Thousand-Bed Layout Prepared

Brunel develops a large modular plan capable of accommodating roughly one thousand military patients.

Brunel, Isambard Kingdom · London
1855 — Renkioi Ventilation System Integrated

The hospital design includes planned ventilation so fresh air can be distributed through the prefabricated ward buildings.

Brunel, Isambard Kingdom · London
1855 — Renkioi Hospital

Designs a prefabricated hospital for wounded soldiers.

Brunel, Isambard Kingdom · Dardanelles
1855 — Great Eastern Watertight Subdivision Developed

Brunel designed extensive internal compartments as part of the ship's unusually advanced damage control arrangements.

Brunel, Isambard Kingdom · Great Eastern
1855 — Crimean Troops Transported By Steamship

Great Britain carried British military personnel during its temporary employment as a Crimean War troopship.

Gray, John · Mediterranean
1855 — Great Western Serves Crimean Troop Transport

The British government employed Great Western as a troop transport during the Crimean War after her civilian mail service.

Brunel, Isambard Kingdom · Crimea
1855, February 16 — Renkioi Hospital

The War Office asks Brunel to design a prefabricated military hospital for the Crimean War.

Brunel, Isambard Kingdom · London
1855, February 22 — Renkioi Hospital

Brunel completes his modular hospital design six days after receiving the commission.

Brunel, Isambard Kingdom · London
1855, July 12 — Renkioi Hospital

The prefabricated Renkioi Hospital is assembled and prepared to receive British military patients.

Brunel, Isambard Kingdom · Renkioi
1856 — Central Tamar Pier Capped

The central river pier is completed to the stage needed for erection of its upper iron support structure.

Brunel, Isambard Kingdom · River Tamar
1856 — Great Eastern Construction Resumes after Financial Crisis

Work continues after disruption caused by John Scott Russell's financial difficulties and bankruptcy.

Brunel, Isambard Kingdom · Millwall
1856 — Great Eastern Shipbuilding Finance Reorganised

Financial arrangements were altered to enable continued construction after the contractor's difficulties.

Brunel, Isambard Kingdom · Great Eastern
1856 — Australian Refit Adds Larger Masts

Great Britain received a renewed rig of three larger masts as part of its midcentury refitting.

Gray, John · Liverpool
1856 — Military Troopship Service Concludes

After its Crimean service Great Britain returned for further refitting and eventual civilian employment.

Gray, John · Great Britain
1856 — Great Western Withdrawn For Dismantling

Great Western was withdrawn and broken up on the Thames in 1856 after nearly two decades of service.

Brunel, Isambard Kingdom · London
1856, January — SS Great Eastern

Work on SS Great Eastern stops temporarily after John Scott Russell's shipbuilding business becomes bankrupt.

Brunel, Isambard Kingdom · Millwall
1857 — Great Eastern Launching Chains and Rams Prepared

Brunel prepares heavy chains and hydraulic equipment for the difficult sideways launch of the enormous ship.

Brunel, Isambard Kingdom · Millwall
1857 — Great Eastern First Launch Fails

The first sideways launching attempt failed and the operation caused a fatal accident among the workers.

Brunel, Isambard Kingdom · Great Eastern
1857 — Great Eastern Hydraulic Launch Equipment Reworked

Engineers adjusted the rams and chains intended to move the heavy ship sideways toward the Thames.

Brunel, Isambard Kingdom · Great Eastern
1857 — Indian Rebellion Reinforcements Carried

The ship was used to transport troops to India during the military response to the uprising of 1857.

Gray, John · Bombay
1857, September 1 — First Royal Albert Truss Floated

The first great main-span truss is floated into position on barges before being raised above the river.

Brunel, Isambard Kingdom · River Tamar
1857, September 1 — First Tamar Truss Turned into Alignment

Tugs, naval vessels and hundreds of workers manoeuvre the first main truss through the river into alignment with its piers.

Brunel, Isambard Kingdom · River Tamar
1857, November — Portrait

Robert Howlett photographs Brunel standing before the launching chains of SS Great Eastern.

Brunel, Isambard Kingdom · Millwall
1857, November 3 — SS Great Eastern

The first attempt to launch SS Great Eastern sideways ends in failure and the death of a worker.

Brunel, Isambard Kingdom · Millwall
1858 — Great Eastern Hull Finally Floated

After prolonged and difficult launch attempts the huge steamship entered the water in January.

Brunel, Isambard Kingdom · Great Eastern
1858 — Passenger Service Resumes After Troop Duties

Great Britain resumed civilian long distance operations after being used to transport soldiers in wartime.

Gray, John · Liverpool
1858, January 31 — SS Great Eastern

SS Great Eastern is finally floated after repeated and costly launching attempts.

Brunel, Isambard Kingdom · Millwall
1858, July 1 — First Tamar Span Raised to Final Height

Hydraulic jacks lift the first main truss to its final height about one hundred feet above the water.

Brunel, Isambard Kingdom · Saltash
1858, July 10 — Second Royal Albert Truss Floated

The second main span is floated into the Tamar to complete the paired crossing arrangement.

Brunel, Isambard Kingdom · River Tamar
1859 — Brunel Crosses Saltash Bridge

The crossing marks completion of one of his final major bridge projects.

Brunel, Isambard Kingdom · Saltash
1859 — Cornwall Railway Connection Completed

Completion of the Tamar crossing allows the Cornwall Railway to connect directly with the South Devon broad-gauge network.

Brunel, Isambard Kingdom · Cornwall
1859 — First Crossing of Royal Albert Bridge

Crosses the completed Royal Albert Bridge while seriously ill.

Brunel, Isambard Kingdom · Saltash
1859 — Royal Albert Bridge Cost Held below £225000

The completed bridge is recorded as costing under two hundred and twenty-five thousand pounds.

Brunel, Isambard Kingdom · Saltash
1859 — Royal Albert Engineering Inscription Added

The Cornish portal carries the prominent inscription 'I K BRUNEL ENGINEER 1859' as part of the completed bridge.

Brunel, Isambard Kingdom · Saltash
1859 — Royal Albert Main Spans Set at 135 Metres

The completed bridge uses two principal spans of about 135 metres each across the navigable Tamar.

Brunel, Isambard Kingdom · Saltash
1859 — Royal Albert Navigation Clearance Achieved

The bridge provides the high navigation clearance demanded by the Admiralty while carrying the railway across the Tamar.

Brunel, Isambard Kingdom · River Tamar
1859 — Royal Albert Seventeen Approach Spans Completed

Seventeen approach spans connect Brunel's two main river spans with the railway on both banks.

Brunel, Isambard Kingdom · Saltash
1859 — Three Bridges Engineering Work

The structure becomes one of Brunel's rare surviving iron bridges.

Brunel, Isambard Kingdom · Southall
1859 — Windmill Bridge Opens

Completes the combined road, rail and canal crossing known as Windmill Bridge.

Brunel, Isambard Kingdom · Southall
1859 — Brunel Dies Before Clifton Completion

Brunel died before the suspension bridge designed under his direction could carry passengers across the Avon Gorge.

Brunel, Isambard Kingdom · Clifton Bridge
1859 — Great Eastern Machinery Trials Prepared

Engineers readied the vessel's steam machinery ahead of its first substantial sea trials.

Brunel, Isambard Kingdom · Great Eastern
1859 — Brunel Suffers Stroke Before Sea Trial

Brunel became gravely ill shortly before the immense vessel he had designed undertook sea trials.

Brunel, Isambard Kingdom · Great Eastern
1859 — Australian Route Becomes Regular Service

Great Britain continued the established Australian emigrant route with steam and sail operating together.

Gray, John · Melbourne
1859 — Royal Albert Bowstring Tubular Principle Completed

Brunel combines tubular compression arches with suspension chains to create the bridge's distinctive bowstring structural system.

Brunel, Isambard Kingdom · Saltash
1859 — Hawkshaw Supports Brunel Memorial Completion

Following Brunel's death, John Hawkshaw joins engineering colleagues who promote completion of the unfinished Clifton crossing as a lasting tribute to its designer.

Hawkshaw, John · Bristol
1859 — Barlow Backs Bridge Memorial Campaign

William Henry Barlow helps revive interest in finishing the Clifton Suspension Bridge as a memorial to Brunel after the engineer dies in September 1859.

Barlow, William Henry · Bristol
1859, April 11 — Royal Albert First Test Train Crosses

A South Devon locomotive makes the first test crossing of Brunel's Royal Albert Bridge.

Brunel, Isambard Kingdom · Saltash
1859, April 20 — Royal Albert Bridge

The Royal Albert Bridge passes its official Board of Trade inspection and load tests.

Brunel, Isambard Kingdom · Saltash
1859, May 2 — Royal Albert Bridge

Prince Albert formally opens the Royal Albert Bridge, although illness prevents Brunel from attending.

Brunel, Isambard Kingdom · Saltash
1859, May 4 — Royal Albert Bridge

Public railway services begin across the Royal Albert Bridge as the Cornwall Railway opens through Saltash.

Brunel, Isambard Kingdom · Saltash
1859, September 5 — Stroke

Brunel suffers a severe stroke shortly before the first sea trials of SS Great Eastern.

Brunel, Isambard Kingdom · Westminster
1859, September 15 — Death of Isambard Kingdom Brunel

Isambard Kingdom Brunel dies at the age of fifty-three after a career transforming railways, bridges, tunnels and ships.

Brunel, Isambard Kingdom · Westminster
1860 — Clifton Suspension Bridge

Chains from Brunel's dismantled Hungerford Suspension Bridge are purchased for use in completing the Clifton bridge.

Brunel, Isambard Kingdom · Bristol
1860 — Great Western Ocean Steamship Legacy Recognised

The Great Western became an important early example of using large purpose built steamships for regular Atlantic travel.

Brunel, Isambard Kingdom · Great Western
1861 — Cricket Tour Voyage Reaches Melbourne

The England cricket party arrived in Australia aboard Great Britain following its voyage across the oceans.

Gray, John · Melbourne
1861 — English Cricketers Sail To Australia

The ship transported the pioneering English cricket team that travelled to tour Australia.

Gray, John · Liverpool
1861 — Livestock Provisioned For Australian Crossing

The cricket tour sailing carried live animals for food alongside passengers and crew during its ocean passage.

Gray, John · Liverpool
1861 — Sail Only Operation Reduces Coal Use

Great Britain could lift its screw propeller clear of the water when favourable winds allowed it to sail without engine power.

Gray, John · Indian Ocean
1861 — Claxton Promotes Bridge Completion Legislation

Brunel supporter Christopher Claxton works to obtain parliamentary authority and financial arrangements needed to revive the Clifton Suspension Bridge undertaking.

Claxton, Christopher · Bristol
1861 — Bridge Company Established For Completion

John Hawkshaw helps establish the organisation charged with finishing the abandoned Clifton Suspension Bridge and raising the resources required for renewed building.

Hawkshaw, John · Bristol
1862 — Clifton Suspension Bridge

Construction restarts under a revised design by William Henry Barlow and John Hawkshaw.

Brunel, Isambard Kingdom · Bristol
1862 — Hawkshaw Specifies Triple Suspension Chains

John Hawkshaw's revised completion design provides three chains on either side of the bridge in place of the two chain arrangement in Brunel's earlier scheme.

Hawkshaw, John · Bristol
1862 — Barlow Develops Wider Bridge Deck

William Henry Barlow helps revise Brunel's bridge plans to provide a wider and higher roadway suited to the completion scheme advanced in the 1860s.

Barlow, William Henry · Bristol
1862 — Egyptian Tower Cladding Removed From Plans

The revised Clifton bridge design associated with Barlow omits Brunel's proposed Egyptian inspired iron tower cladding, leaving the monumental masonry visible.

Barlow, William Henry · Bristol
1862 — Clifton Bridge Restarted

Hawkshaw helps restart work on the Clifton Suspension Bridge.

Hawkshaw, John · Bristol
1863 — Chain Transport Traveller Runs Across Gorge

The Clifton construction team uses a wheeled travelling apparatus running along temporary cables to move heavy suspension links into place above the river.

Hawkshaw, John · Avon Gorge
1863 — Nine Temporary Gorge Cables Installed

During the summer of 1863 the bridge builders stretch nine substantial cables between the towers to support working platforms, transport equipment and chain installation.

Hawkshaw, John · Avon Gorge
1863 — Temporary Plank Platform Suspended Above Avon

Workers suspend a narrow planked platform over the Avon Gorge from temporary cables, allowing them to assemble the chains that will ultimately carry the roadway.

Barlow, William Henry · Avon Gorge
1863, October 15 — October Australian Passenger Crossing Begins

Under Captain John Gray SS Great Britain remained engaged in the long distance Australia trade in the early 1860s, carrying emigrants between Britain and Melbourne.

Gray, John · Liverpool
1863, December 17 — December Australian Arrival Achieved

Captain John Gray supervised the passage of SS Great Britain to Australia during the 1860s, when the vessel had an established reputation on the emigrant route.

Gray, John · Melbourne
1864 — Clifton Suspension Bridge

The completed structure is tested by placing about five hundred tons of stone across the bridge deck.

Brunel, Isambard Kingdom · Bristol
1864 — Manby Conducts Official Structural Inspection

On 7 November 1864 Sir Charles Manby examines the Clifton bridge for the government and reports favourably on its strength and workmanship.

Manby, Charles · Bristol
1864 — Bridge Illuminated With Magnesium Flares

The Clifton bridge is illuminated for its December 1864 inauguration with contemporary lighting techniques including limelight and magnesium flares, although strong wind disrupts the display.

Hawkshaw, John · Bristol
1864 — Bridge Ironwork Receives Protective Painting

As final preparations continue in November 1864, the bridge ironwork is painted a chocolate brown colour to protect and finish the new suspension structure.

Hawkshaw, John · Bristol
1864 — British Association Delegates Inspect Crossing

On 22 September 1864 John Hawkshaw helps show the nearly completed Clifton bridge to visiting members of the British Association for the Advancement of Science.

Hawkshaw, John · Bristol
1864 — Construction Traveller Carries Engineers Across

After the final girder is set on 2 July 1864, bridge engineers cross the unfinished span in the movable construction traveller while spectators watch from the gorge.

Hawkshaw, John · Bristol
1864 — Quarried Stone Spread For Loading Test

In early November 1864 workers distribute stone across the Clifton bridge roadway, preparing the newly constructed span for a substantial proof load test.

Hawkshaw, John · Bristol
1864 — Suspension Rod Installation Under Way

On 17 May 1864 engineers are fitting the vertical suspension rods and girders, transferring the design from completed chains toward a load bearing road deck.

Hawkshaw, John · Bristol
1864 — Trade Societies Organise Opening Procession

Bristol trade and friendly societies arrange a large civic procession to celebrate the completed suspension crossing during the December opening ceremonies.

Hawkshaw, John · Bristol
1864 — Bridge Opening Date Confirmed By Directors

At a meeting on 3 November 1864 the Clifton bridge directors determine that the formal opening will take place on 8 December after earlier dates prove impractical.

Barlow, William Henry · Bristol
1864 — Clifton Approach Road Prepared For Traffic

The completion works include cutting and finishing an approach road on the Clifton side, linking the new suspension bridge with the surrounding road network.

Barlow, William Henry · Clifton
1864 — Clifton Span Passes Five Hundred Ton Test

Engineers test the completed Clifton suspension structure under approximately five hundred tons of stone and find its resulting deflection within acceptable limits.

Barlow, William Henry · Bristol
1864 — Final Cross Girder Fixed Into Bridge

On 2 July 1864 the last main cross girder is installed, completing the structural framework on which the Clifton bridge roadway is subsequently laid.

Barlow, William Henry · Bristol
1864 — Hungerford Ironwork Serves Clifton Opening

The completed Clifton Suspension Bridge used salvaged chains from Brunel's former London crossing.

Barlow, William Henry · Hungerford
1864 — Last Suspension Chain Link Secured

On 8 May 1864 workers secure the final link among approximately four thousand two hundred suspension links, completing the bridge's principal supporting chains.

Barlow, William Henry · Bristol
1864 — Opening Procession Brings Thousands Into Bristol

On 8 December 1864 the inauguration of the Clifton bridge draws a vast crowd to Bristol as military units and local trades process through the city.

Barlow, William Henry · Bristol
1864, December 8 — Clifton Suspension Bridge

The Clifton Suspension Bridge opens to the public as a memorial to Brunel five years after his death.

Brunel, Isambard Kingdom · Bristol
1864, December 8 — Clifton Bridge Opened

The Clifton Suspension Bridge opens to the public.

Barlow, William Henry · Bristol
1865 — Passengers Witness Solar Eclipse Near Brazil

Passengers on SS Great Britain observed a total solar eclipse near Brazil during a passage home from Australia.

Gray, John · Atlantic Ocean
1868, October 8 — Australian Return Cargo Includes Gold

A voyage departing Melbourne carried valuable gold alongside other cargo and homeward bound passengers.

Gray, John · Melbourne
1872, October 23 — October Melbourne Departure Recorded

Great Britain embarked on a return passage from Melbourne to Liverpool during its later Australian service.

Gray, John · Melbourne
1872, November 25 — Captain Disappears During Ocean Passage

Captain John Gray disappeared at sea during a return passage from Australia and the circumstances remained unclear.

Gray, John · Atlantic Ocean
1872, December 25 — Crew Continues Passage After Gray Vanishes

After Captain John Gray disappeared at sea in November 1872, the surviving crew continued the voyage towards Liverpool, where news of his disappearance became public.

Gray, John · Liverpool
1874 — Great Britain Collides With Mysore

SS Great Britain collided with the vessel Mysore in November 1874 during her later Australian service, suffering damage and losing an anchor.

Great Britain, SS · Liverpool
1876 — Final Australian Service Concludes

The iron ship designed by Brunel made its final return to Liverpool from Australian passenger service and was laid up.

Brunel, Isambard Kingdom · Liverpool
1876 — Final Australian Service Concludes

The iron ship designed by Brunel made its final return to Liverpool from Australian passenger service and was laid up.

Great Britain, SS · Liverpool
1881 — New Owners Acquire Great Britain

Commercial owners purchased Great Britain for a new working life as a cargo carrying sailing ship.

Brunel, Isambard Kingdom · Great Britain
1881 — New Owners Acquire Great Britain

Commercial owners purchased Great Britain for a new working life as a cargo carrying sailing ship.

Great Britain, SS · Great Britain
1882 — Steam Engines Removed From Vessel

The vessel was converted to sail only service and its steam machinery was removed for cargo operations.

Brunel, Isambard Kingdom · Great Britain
1882 — Coal Cargo Trade To California Begins

Great Britain entered sailing ship service transporting coal around Cape Horn toward San Francisco.

Brunel, Isambard Kingdom · San Francisco
1882 — Coal Cargo Trade To California Begins

Great Britain entered sailing ship service transporting coal around Cape Horn toward San Francisco.

Great Britain, SS · San Francisco
1882 — Steam Engines Removed From Vessel

The vessel was converted to sail only service and its steam machinery was removed for cargo operations.

Great Britain, SS · Great Britain
1883 — California Return Trade Carries Wheat

The vessel served the transoceanic cargo trade by returning with grain after delivering coal to California.

Brunel, Isambard Kingdom · San Francisco
1883 — California Return Trade Carries Wheat

The vessel served the transoceanic cargo trade by returning with grain after delivering coal to California.

Great Britain, SS · San Francisco
1886 — Cape Horn Storm Dismasts Vessel

A violent storm damaged Great Britain and stripped away masts during an attempted cargo voyage around Cape Horn.

Brunel, Isambard Kingdom · Cape Horn
1886 — Damaged Ship Seeks Falklands Refuge

After storm damage Great Britain reached the Falkland Islands rather than continuing its planned cargo voyage.

Brunel, Isambard Kingdom · Port Stanley
1886 — Cargo Sailing Career Ends

Damage sustained near Cape Horn ended the vessel career as a seagoing cargo ship.

Brunel, Isambard Kingdom · Falkland Islands
1886 — Cape Horn Storm Dismasts Vessel

A violent storm damaged Great Britain and stripped away masts during an attempted cargo voyage around Cape Horn.

Great Britain, SS · Cape Horn
1886 — Cargo Sailing Career Ends

Damage sustained near Cape Horn ended the vessel career as a seagoing cargo ship.

Great Britain, SS · Falkland Islands
1886 — Damaged Ship Seeks Falklands Refuge

After storm damage Great Britain reached the Falkland Islands rather than continuing its planned cargo voyage.

Great Britain, SS · Port Stanley
1887 — Hulk Serves As Floating Store

Great Britain entered a prolonged period of use as a stationary storage hulk at Port Stanley.

Brunel, Isambard Kingdom · Port Stanley
1887 — Hulk Serves As Floating Store

Great Britain entered a prolonged period of use as a stationary storage hulk at Port Stanley.

Great Britain, SS · Port Stanley
1908 — Royal Visit Marked By Bridge Lanterns

The chains of the Clifton Suspension Bridge are decorated with coloured lanterns to commemorate the visit of King Edward VII to Bristol in 1908.

VII, Edward · Bristol
1911 — Coronation Illuminations Adorn Suspension Chains

Clifton Suspension Bridge is illuminated to celebrate the 1911 coronation of George V and Queen Mary, continuing a tradition of public decorative lighting.

V, George · Bristol
1925 — King Visit Commemorated With Illuminations

The Clifton bridge is specially illuminated during the 1925 royal visit of King George V to Bristol, using lighting to mark the occasion.

V, George · Bristol
1930 — Clifton Displays French Week Electric Lights

During Bristol French Week in 1930, electric lights in French national colours illuminate the suspension bridge, reflecting its developing role in civic festivities.

Bristol Corporation · Bristol
1933 — Bristol Brighton Week Bridge Display Staged

The bridge is lit with approximately fifteen hundred electric bulbs during the 1933 Bristol Brighton Week celebrations, extending its use for civic events.

Bristol Corporation · Bristol
1935 — Silver Jubilee Doubles Bridge Lighting Bulbs

Clifton bridge illuminations use approximately three thousand bulbs for the 1935 Silver Jubilee celebrations of King George V, expanding earlier electric displays.

V, George · Bristol
1937, April 14 — Historic Iron Hull Abandoned In Sparrow Cove

Great Britain was deliberately settled in shallow water at Sparrow Cove after years of work as a storage hulk.

Great Britain, SS · Sparrow Cove
1937, April 14 — Historic Iron Hull Abandoned In Sparrow Cove

Great Britain was deliberately settled in shallow water at Sparrow Cove after years of work as a storage hulk.

Brunel, Isambard Kingdom · Sparrow Cove
1951 — Festival Of Britain Lighting Installed

For the 1951 Festival of Britain, the Clifton bridge is illuminated with thousands of bulbs, making the nineteenth century landmark part of a national celebration.

Clifton Suspension Bridge Trust · Bristol
1953 — Coronation Lighting Spans Clifton Bridge

The bridge receives extensive decorative lighting for the 1953 coronation of Elizabeth II, with illuminated chains and structures contributing to local celebrations.

II, Elizabeth · Bristol
1959 — Atkinson Photographs Brunel Centenary Lights

As a child, Jane Atkinson photographs the illuminated Clifton bridge in 1959 during events marking one hundred years since Brunel's death.

Atkinson, Jane · Bristol
1964 — Centenary Illumination Marks Bridge Opening

The Clifton Suspension Bridge is lit with thousands of lamps in 1964 to celebrate the centenary of its original public opening.

Clifton Suspension Bridge Trust · Bristol
1967 — Corlett Proposes Historic Ship Rescue

Naval architect Ewan Corlett publicly advocated saving Great Britain and helping return the historic vessel to Bristol.

Corlett, Ewan · Great Britain
1968 — Great Britain Recovery Organisation Formed

The campaign to recover SS Great Britain built support after naval architect Ewan Corlett publicly argued that the abandoned iron vessel should be rescued.

Corlett, Ewan · Great Britain
1970 — Salvage Engineering Survey Supports Recovery

Ewan Corlett helped establish the technical feasibility of recovering and transporting the decayed iron vessel.

Corlett, Ewan · Falkland Islands
1970 — Hayward Funds Falklands Salvage Campaign

Jack Hayward contributed substantial financial support that helped make the recovery of Great Britain possible.

Hayward, Jack · Great Britain
1970, April 13 — Ship Raised Onto Transport Pontoon

The abandoned Great Britain was lifted onto a submersible pontoon to prepare for its long tow to Britain.

Corlett, Ewan · Port Stanley
1970, April 24 — Historic Vessel Begins Return Voyage

Great Britain began the ocean tow from the Falkland Islands that would eventually take it back to Bristol.

Corlett, Ewan · Port Stanley
1970, June 22 — Recovered Steamship Reaches Barry

The salvaged ship reached Barry in Wales on a transport pontoon after its Atlantic journey.

Corlett, Ewan · Barry
1970, July 19 — Original Bristol Dry Dock Receives Ship

Great Britain returned to its original building dock in Bristol after a century away from the city.

Corlett, Ewan · Bristol
2000 — Conservation Planning Addresses Serious Hull Corrosion

Conservation surveys revealed that SS Great Britain remained vulnerable to corrosion and prompted plans for controlled dry dock preservation.

Corlett, Ewan · Bristol
2002 — Hungerford Chain Heritage Documented

Conservation work on Clifton's suspension structure preserved evidence of iron links originally made for Hungerford Bridge.

Clifton Suspension Bridge Trust · Hungerford
2002 — Leigh Woods Abutment Chambers Identified

An engineering inspection revealed internal vaulted chambers inside the apparently solid Leigh Woods masonry abutment.

Clifton Suspension Bridge Trust · Clifton Bridge
2002 — Leigh Woods Vault Interiors Surveyed

An inspection at the Leigh Woods end of the Clifton Suspension Bridge identifies hollow vaulted chambers inside the masonry abutment previously thought to be solid.

Clifton Suspension Bridge Trust · Leigh Woods
2004 — Guide Lite Lighting Removed From Structure

During the period in which Dayrell McArthur chairs the bridge trust, the deteriorated Guide Lite illumination system is removed by October 2004 ahead of modern lighting improvements.

McArthur, Dayrell · Bristol
2005 — Preserved Steamship Gains Glass Sea

A major conservation project at Brunel's former building dock incorporated a protective glass waterline around the vessel.

Corlett, Ewan · Bristol
2006 — Historic Vessel Wins National Museum Prize

The preserved SS Great Britain received the 2006 Gulbenkian Prize for Museum of the Year, recognising the museum and its public presentation.

Trust, SS Great Britain · Bristol
2006 — Efficient LED Bridge Illumination Completed

A modern LED lighting installation is completed on the Clifton Suspension Bridge in 2005 and 2006, reducing energy demand and avoiding excessive light pollution.

McArthur, Dayrell · Bristol
2014 — Clifton Bridge Anniversary Celebrated

The bridge marked 150 years since its opening as a lasting landmark of nineteenth century engineering.

Clifton Suspension Bridge Trust · Clifton Bridge
2014 — Hungerford Chain Reuse Celebrated

Interpretations of Clifton Bridge's history highlighted the recycled nineteenth century suspension chains from London.

Clifton Suspension Bridge Trust · Hungerford
2015 — Atkinson Recreates Historic Bridge Photograph

Jane Atkinson returns with the same photographic equipment she used in 1959 to recreate her childhood photograph of the illuminated Clifton bridge.

Atkinson, Jane · Bristol