Royal Albert Bridge

Brunel's Saltash railway crossing over the River Tamar

Great Western Railway postcard of the Royal Albert Bridge, published 1908
Great Western Railway postcard of the Royal Albert Bridge, published 1908 — Image: Wikimedia Commons source and licence

Historical chronology

20 matching records from the updated 653-record Brunel dataset.

1848 — Tamar Bridge Preliminary Works Begin

Early work begins on Brunel's proposed railway crossing of the River Tamar before the project is later restarted.

Brunel, Isambard Kingdom · Saltash
1848, April 26th — Royal Albert Bridge

Brunel launches a survey cylinder into the River Tamar to investigate foundations for the future bridge.

Brunel, Isambard Kingdom · Saltash
1849 — Windsor-Slough Thames Crossing

The bow-and-string design anticipates later work at Saltash.

Brunel, Isambard Kingdom · Windsor
1849 — Wye Bridge Works Begin

The tubular design influences Brunel's later Royal Albert Bridge.

Brunel, Isambard Kingdom · Chepstow
1853 — Royal Albert Bridge

Brunel finalises the distinctive lenticular truss design for the railway bridge across the River Tamar.

Brunel, Isambard Kingdom · Saltash
1853, July 4th — Cornish Pier Foundation Ceremony

The foundation for a Cornish-side pier of the Royal Albert Bridge is formally laid at Saltash.

Brunel, Isambard Kingdom · Saltash
1854 — Royal Albert Bridge Works Restarted

Major construction restarts on the Tamar railway bridge after the earlier preliminary phase.

Brunel, Isambard Kingdom · Saltash
1854, May — Royal Albert Bridge

Construction begins on Brunel's Royal Albert Bridge across the River Tamar between Devon and Cornwall.

Brunel, Isambard Kingdom · Saltash
1858, July 1st — First Tamar Span Raised to Final Height

Hydraulic jacks lift the first main truss to its final height about one hundred feet above the water.

Brunel, Isambard Kingdom · Saltash
1859 — Brunel Crosses Saltash Bridge

The crossing marks completion of one of his final major bridge projects.

Brunel, Isambard Kingdom · Saltash
1859 — First Crossing of Royal Albert Bridge

Crosses the completed Royal Albert Bridge while seriously ill.

Brunel, Isambard Kingdom · Saltash
1859 — Royal Albert Bowstring Tubular Principle Completed

Brunel combines tubular compression arches with suspension chains to create the bridge's distinctive bowstring structural system.

Brunel, Isambard Kingdom · Saltash
1859 — Royal Albert Bridge Cost Held below £225000

The completed bridge is recorded as costing under two hundred and twenty-five thousand pounds.

Brunel, Isambard Kingdom · Saltash
1859 — Royal Albert Engineering Inscription Added

The Cornish portal carries the prominent inscription 'I K BRUNEL ENGINEER 1859' as part of the completed bridge.

Brunel, Isambard Kingdom · Saltash
1859 — Royal Albert Main Spans Set at 135 Metres

The completed bridge uses two principal spans of about 135 metres each across the navigable Tamar.

Brunel, Isambard Kingdom · Saltash
1859 — Royal Albert Seventeen Approach Spans Completed

Seventeen approach spans connect Brunel's two main river spans with the railway on both banks.

Brunel, Isambard Kingdom · Saltash
1859, April 11th — Royal Albert First Test Train Crosses

A South Devon locomotive makes the first test crossing of Brunel's Royal Albert Bridge.

Brunel, Isambard Kingdom · Saltash
1859, April 20th — Royal Albert Bridge

The Royal Albert Bridge passes its official Board of Trade inspection and load tests.

Brunel, Isambard Kingdom · Saltash
1859, May 2nd — Royal Albert Bridge

Prince Albert formally opens the Royal Albert Bridge, although illness prevents Brunel from attending.

Brunel, Isambard Kingdom · Saltash
1859, May 4th — Royal Albert Bridge

Public railway services begin across the Royal Albert Bridge as the Cornwall Railway opens through Saltash.

Brunel, Isambard Kingdom · Saltash