Maidenhead Railway Bridge

The low, wide brick arches carrying the Great Western Railway over the Thames

Photograph of Brunel’s Maidenhead Railway Bridge
Photograph of Brunel’s Maidenhead Railway Bridge — Image: Wikimedia Commons source and licence

Historical chronology

7 matching records from the updated 653-record Brunel dataset.

1838 — Early GWR Broad-Gauge Operations Begin

The first working section of the Great Western Railway demonstrates Brunel's broad-gauge track and early bridge designs.

Brunel, Isambard Kingdom · Maidenhead
1838 — Early GWR Overbridge

The bridge forms part of Brunel's first London-to-Maidenhead contracts.

Brunel, Isambard Kingdom · Slough
1838 — Maidenhead Railway Bridge

Construction of Brunel's low-arched brick railway bridge across the Thames is completed.

Brunel, Isambard Kingdom · Maidenhead
1838 — Paddington Maidenhead Passenger Services Begin

The first public Great Western services operated between Paddington and Maidenhead in June.

Brunel, Isambard Kingdom · Paddington
1838, June 4th — Great Western Railway

The first public section of the Great Western Railway opens between Paddington and Maidenhead.

Brunel, Isambard Kingdom · Paddington
1838, June 4th — Paddington Station

The first temporary Great Western Railway terminus at Paddington opens for services between London and Maidenhead.

Brunel, Isambard Kingdom · London
1839, July 1st — Maidenhead Railway Bridge

Maidenhead Railway Bridge opens to traffic and vindicates Brunel's unusually flat arch design.

Brunel, Isambard Kingdom · Maidenhead

Search all Brunel chronology records