Wiltshire Earthworks Begin
Work on the line toward Chippenham involved cuttings embankments and structures across the Wiltshire landscape.
Follow Isambard Kingdom Brunel through 477 dated historical records for Great Britain.
A chronological timeline drawn from matching World History Database records.
Work on the line toward Chippenham involved cuttings embankments and structures across the Wiltshire landscape.
Construction teams developed the masonry support at Leigh Woods for the planned suspended bridge deck.
Brunel's large paddle steamship entered the water before machinery fitting and sea trials were completed.
Plans progressed for a suspension bridge to connect the north bank of the Thames with the south bank near Hungerford Market.
Facilities were built to allow the Great Western Railway to start passenger services before a permanent terminus existed.
Great Western's exceptionally large dimensions made her one of the most ambitious merchant steamships of her time.
After launching at Bristol, Great Western travelled to London for fitting out with her propulsion machinery.
Great Western received side lever steam engines supplied by the engineering firm Maudslay Sons and Field.
The London fitting out supplied the large boilers necessary to sustain Great Western's paddle wheel propulsion.
Great Western carried a four masted auxiliary sailing arrangement alongside her steam machinery.
The vessel's accommodation was arranged for paying cabin passengers and accompanying servants on the Bristol to New York route.
The company undertaking work on the Leigh Woods abutment encounters financial failure, disrupting renewed construction on Brunel's Clifton suspension bridge.
SS Great Western completes an early sea trial before beginning her first Atlantic service.
Brunel is injured after falling about twenty feet during the confusion surrounding the Great Western engine-room fire.
An engine-room fire breaks out as Great Western prepares for her maiden Atlantic voyage but is extinguished with limited ship damage.
SS Great Western departs Bristol on her first Atlantic voyage to New York.
SS Great Western reaches New York and demonstrates the commercial practicality of regular steamship crossings.
The first public section of the Great Western Railway opens between Paddington and Maidenhead.
The first temporary Great Western Railway terminus at Paddington opens for services between London and Maidenhead.
Work begins on Box Tunnel through Box Hill for the Great Western Railway.
Construction of Brunel's low-arched brick railway bridge across the Thames is completed.
The structure reflects Brunel's broad-gauge railway design.
Designs the sharply skewed Dumb Bell Bridge beneath the Great Western Railway.
The bridge preserves Brunel's early broad-gauge engineering approach.
The work is among Brunel's earliest iron bridge designs.
The first working section of the Great Western Railway demonstrates Brunel's broad-gauge track and early bridge designs.
The bridge forms part of Brunel's first London-to-Maidenhead contracts.
Early plans for Brunel's second major steamship envisage a wooden paddle vessel initially called City of New York.
Many booked passengers cancel after the fire, leaving only a small number aboard when Great Western departs for New York.
Completes the Leigh Road overbridge on the early Great Western Railway.
Completes an early Great Western Railway overbridge at Middlegreen Road.
Designs an early iron bridge across the Paddington Arm of the canal.
Completes the St Mary's Road bridge on the Great Western Railway.
Solves a difficult road crossing with an ingenious skew arch.
Brunel developed proposals to improve harbour entrances as increasing steamship dimensions challenged the original locks.
Contractors worked on embankments bridges and cuttings needed to carry broad gauge trains through the Avon valley.
The Great Western route incorporated a station site to serve Chippenham and surrounding communities.
Contractors continued the Clifton side tower and its supporting masonry above the Avon Gorge.
A fire aboard the vessel shortly before its maiden Atlantic voyage delayed preparations and injured Brunel.
Brunel assessed the Thames crossing and the foundation requirements for the proposed suspension structure.
These dates and descriptions come from the historical_events database. Exact duplicate records have been collapsed. Names are grouped by the country, Name 2 and Name 1 fields; records with missing Name 2 cannot be reliably assigned to an individual biography. Check the underlying sources before formal citation.