Gatehampton Viaduct
Completes the original Gatehampton Viaduct across the River Thames.
Follow Isambard Kingdom Brunel through 477 dated historical records for Great Britain.
A chronological timeline drawn from matching World History Database records.
Completes the original Gatehampton Viaduct across the River Thames.
The steamship directors accept Brunel's recommendation and approve converting the vessel to screw propulsion.
Designs a Great Western Railway bridge near Saltford.
Designs an accommodation bridge south of Kemble for the railway.
The bridge forms part of Brunel's Bristol-to-Bath railway section.
The viaduct forms part of the pioneering Great Western main line.
Completes the original Moulsford Viaduct across the Thames.
Designs the Great Western Railway crossing over the River Chew.
The masonry structure belongs to the pioneering Bristol-Bath section.
Completes the skew railway bridge over the Avon at Bath.
The elegant masonry crossing carries Brunel's broad-gauge railway.
The structure incorporates arches, railway facilities and workers' accommodation.
Completes the long Twerton Viaduct for the Great Western Railway.
Brunel incorporates railway facilities and workers' dwellings into the long masonry viaduct at Twerton.
Brunel's line used masonry bridges and viaducts to carry trains through the city and its narrow approaches.
The long masonry viaduct at Twerton provided a continuous rail alignment on the western approach to Bath.
The Great Western route crossed the River Chew at Keynsham on its passage between Bath and Bristol.
Railway structures near Saltford carried Brunel's broad gauge line through the Avon valley.
Railway passengers could travel between Bath and Bristol using the newly opened Great Western section.
Bath's Great Western Railway station commenced operations as the new Bristol to Bath section opened.
The broad gauge alignment relied on embankments to maintain manageable gradients beside sections of the Avon.
A railway bridge near Dorchester Street carried the Great Western route through Bath's built up centre.
Brunel's carefully surveyed route minimised steep railway gradients along the valley approaching Bath.
Brunel's river crossings were designed for the wider track gauge adopted by the Great Western Railway.
The Great Western Railway opened its section from Wootton Bassett to Chippenham in December.
The initial railway connection made Chippenham an operating terminus while the remaining route west was unfinished.
The arrival of the railway provided a new means of moving Wiltshire goods toward the growing Great Western network.
The new section used Brunel's broad gauge track system rather than the standard gauge used on many other railways.
The railhead at Chippenham served as an interim endpoint pending the completion of the line through Box Tunnel.
The bridge project arranged manufacture of its suspension chains at the Copperhouse Foundry in Cornwall.
Brunel adopted wrought iron suspension chains to support the bridge deck across the Thames.
Chain manufacture at the Copperhouse Foundry supported the large suspension bridge projects undertaken by Brunel.
The ship's refit produced a longer vessel better suited to carrying additional passengers on Atlantic passages.
The Clifton bridge undertaking contracts with Copperhouse Foundry in Hayle to produce suspension chains, although the project's financial difficulties later prevent their intended installation.
The Leigh Woods masonry abutment reaches an advanced state by 1840, forming a substantial foundation for the suspension structure planned across the gorge.
The opposing tunnel workings meet with an alignment error of less than two inches and construction is completed.
Box Tunnel opens as the longest railway tunnel in the world at the time.
The complete Great Western Railway route between London and Bristol opens for through services.
Completion of the main line allows continuous railway travel between London and Bristol in about four hours.
The structure becomes a surviving element of Brunel's original railway.
These dates and descriptions come from the historical_events database. Exact duplicate records have been collapsed. Names are grouped by the country, Name 2 and Name 1 fields; records with missing Name 2 cannot be reliably assigned to an individual biography. Check the underlying sources before formal citation.