Box Tunnel West Portal Architecture Completed
The western entrance is finished with a more elaborate architectural treatment than the simpler eastern portal.
Follow Isambard Kingdom Brunel through 477 dated historical records for Great Britain.
A chronological timeline drawn from matching World History Database records.
The western entrance is finished with a more elaborate architectural treatment than the simpler eastern portal.
Brunel pushes the main contractor to increase the Box Tunnel workforce from about twelve hundred to four thousand men.
The viaduct opens with the completed Great Western route.
Completes the principal railway viaduct at Chippenham.
Brunel's railway viaduct at Chippenham opens with the completed Great Western route.
The completed London-to-Bristol main line extends roughly 116 miles and embodies Brunel's integrated railway design.
Completes the Quaker's Yard viaduct for the Taff Vale Railway.
Completes a railway footbridge through Sydney Gardens in Bath.
The crossing supports rail access for the South Wales iron industry.
Completion of the remaining main line made uninterrupted railway journeys possible between Bath and London.
Opening the Box Tunnel completed the route through the hills east of Bath and connected the Avon valley to Chippenham.
The fully connected Great Western route improved Bath's access to London and Bristol by rail.
The new route's masonry structures supported regular broad gauge passenger and goods trains through the Avon valley.
The completion of the eastern section established a continuous railway journey from Bath toward Chippenham.
Masonry work on the railway integrated bridges and station buildings with the region's Bath stone architectural tradition.
The railway approaches toward Box Tunnel carried trains eastward from Bath on the completed main line.
The viaduct carried regular railway traffic once the completed Great Western route opened through the town.
Opening the long Box Tunnel connected Chippenham by rail with Bath and the Bristol section beyond.
Passengers could travel directly from Chippenham to Bristol following completion of the main line.
The completed Great Western line enabled a continuous railway journey between Chippenham and Paddington.
Brunel's completion of the missing Wiltshire works joined the separately operating sections of the railway.
The town ceased to be a temporary terminus and became a through station on the London to Bristol main line.
The route's bridges and structures reflected the generous clearances adopted for Brunel's broad gauge trains.
Stone towers rose above the gorge while work on abutments and chain anchorage structures proceeded.
Work progressed on the foundations and river supports needed for the Thames pedestrian suspension bridge.
Brunel assists the Royal Navy in fitting HMS Rattler with screw propulsion and suitable engines.
The bridge towers, abutments and four anchor tunnels are substantially completed before the project again runs short of money.
The ship's machinery uses a large chain drive to transmit engine power to the screw propeller.
Work began on rebuilding the southern Cumberland Basin entrance to admit larger vessels using Bristol's port.
The Great Western Railway offered merchants a more direct land transport route for goods moving through the Bath area.
The towers abutments and principal anchor tunnels had been substantially completed by 1842.
Masonry towers were built to support the suspension chains and the elevated pedestrian deck.
Work on the original Clifton bridge scheme produces four anchorage tunnels by 1842, alongside the towers and abutments intended to secure the proposed iron chains.
The principal stone piers and abutments of Brunel's original design are substantially complete by 1842, despite the continued absence of a suspended roadway.
The Great Western Railway works open at New Swindon and become a major centre for locomotive engineering.
The Thames Tunnel opens to pedestrians after eighteen years of construction begun under Marc and Isambard Brunel.
Brunel accidentally inhales a half-sovereign coin and later designs equipment to help remove it.
SS Great Britain is launched as the largest ship in the world and a pioneering iron screw steamship.
Prince Albert attends the public launch of SS Great Britain in Bristol's Floating Harbour.
Funds are exhausted and construction stops before the chains and roadway can be completed.
These dates and descriptions come from the historical_events database. Exact duplicate records have been collapsed. Names are grouped by the country, Name 2 and Name 1 fields; records with missing Name 2 cannot be reliably assigned to an individual biography. Check the underlying sources before formal citation.