Clifton Ironwork Funding Shortfall
Construction stalls because the bridge company lacks the funds needed to complete the chains and roadway.
Follow Isambard Kingdom Brunel through 477 dated historical records for Great Britain.
A chronological timeline drawn from matching World History Database records.
Construction stalls because the bridge company lacks the funds needed to complete the chains and roadway.
SS Great Britain is equipped with a six-masted schooner rig designed to reduce the sailing manpower required.
Earlier survey work by Brunel helps shape plans for extending broad-gauge railway communication from Exeter toward Plymouth.
Brunel developed a large wrought iron caisson arrangement to increase the usable length of the improved entrance lock.
The Bath section became part of the established London to Bristol route serving passengers and freight.
Construction slowed dramatically when available capital proved insufficient to complete the deck and ironwork.
Workers installed or prepared the massive iron links required to suspend the bridge across the river.
With the masonry largely finished, the Clifton bridge project still requires roughly thirty thousand pounds for remaining ironwork, a shortfall that prevents completion of the crossing.
SS Great Britain is completed for service but remains delayed by limitations in Bristol Harbour.
Parliament authorises the South Devon Railway, enabling Brunel's route from Exeter toward Plymouth to proceed.
SS Great Britain finally leaves Bristol Floating Harbour after modifications are made to the harbour locks.
Brunel recommends atmospheric propulsion for the South Devon Railway, expecting savings and greater freedom in gradients and curves.
The rebuilt southern entrance was planned to accommodate larger steamships than the earlier Bristol dock entrance.
Construction progressed on the walkway suspended from the large iron chains over the Thames.
SS Great Britain departs Liverpool for New York on her first transatlantic voyage.
SS Great Britain is completed and prepared for transatlantic passenger service.
The ship designed by Brunel reached New York on its inaugural Atlantic passage after departing Liverpool in July.
SS Great Britain reaches New York after becoming the first iron steamship to cross the Atlantic Ocean.
The new screw steamship departed New York for Liverpool on its first homeward passenger voyage.
Great Britain completed its inaugural return crossing and arrived in Liverpool after sailing from New York.
Great Britain began another westbound service when it left Liverpool for New York in late September.
Great Britain reached New York on its second westbound commercial voyage of the year.
The steamship sailed from New York for Liverpool on a further return crossing with a small passenger complement.
Great Britain arrived back at Liverpool after the late October departure from New York.
Brunel is elected to the council of the Institution of Civil Engineers.
Contracts are placed for stationary engines and equipment needed to operate Brunel's atmospheric railway system.
Its chains are later reused to complete the Clifton Suspension Bridge.
Completes the Hungerford Suspension Bridge across the Thames.
Brunel's entrance lock adopted an innovative single leaf caisson closure that maximised usable chamber dimensions.
Additional operations made the Avon valley an important through corridor in the Great Western system.
The bridge's standing towers showed the project's progress but the span still lacked its suspended roadway.
Brunel's suspension bridge opened for pedestrians between Hungerford Market and the southern Thames bank.
Users of the new crossing paid tolls to travel across Brunel's suspended Thames walkway.
The bridge improved pedestrian access across the Thames between the market district and the south bank.
SS Great Britain lost propeller blades during her first homeward Atlantic passage and relied on sail power to return to Liverpool.
Great Britain sailed west from Liverpool in May on another scheduled crossing to New York.
The first South Devon section opens with conventional locomotives while the atmospheric equipment is still being installed.
Great Britain arrived at New York after its spring voyage from Liverpool.
The ship embarked on a June homeward crossing from New York to Liverpool.
Great Britain completed its June Atlantic return and reached Liverpool.
These dates and descriptions come from the historical_events database. Exact duplicate records have been collapsed. Names are grouped by the country, Name 2 and Name 1 fields; records with missing Name 2 cannot be reliably assigned to an individual biography. Check the underlying sources before formal citation.