Paddington Maidenhead Passenger Services Begin
The first public Great Western services operated between Paddington and Maidenhead in June.
Follow Isambard Kingdom Brunel through 477 dated historical records for Great Britain.
A chronological timeline drawn from matching World History Database records.
The first public Great Western services operated between Paddington and Maidenhead in June.
The temporary terminus served trains built to Brunel's unusually wide railway gauge.
Brunel designed an iron bridge at the Paddington Arm as railway works crossed the canal network.
A fire around Great Western's machinery during preparations for her inaugural crossing delayed the beginning of service.
Brunel was injured during the response to a fire involving Great Western before the first Atlantic voyage.
Great Western's four masts provided auxiliary sailing capability alongside the paddle wheels during her early transatlantic operations.
Maidenhead Railway Bridge opens to traffic and vindicates Brunel's unusually flat arch design.
Construction begins on Brunel's iron-hulled transatlantic steamship SS Great Britain.
Difficult rock strata and heavy water ingress delay excavation, with less than half of the tunnel completed.
The Tudor-Gothic bridge forms part of Brunel's Bristol-Bath railway works.
Completes Brook Road Bridge for the Great Western Railway near Bath.
Supports installation of electric telegraph wires beside the Great Western Railway.
Brunel successfully defends his engineering decisions when dissatisfied shareholders attempt to remove him from the railway project.
Brunel and the building committee recommend changing the new steamship from wood to iron construction.
The Paddington-West Drayton link becomes an early commercial telegraph installation.
Brunel develops the masonry viaduct carrying the Great Western Railway across the River Avon in Wiltshire.
A railway overbridge at Brook Road formed part of Brunel's engineered approach toward Bath.
Railway builders prepared the stonework for an Avon crossing on the Great Western route through Wiltshire.
Brunel's engineering plans provided a railway crossing over the River Avon near Chippenham.
Masonry construction progressed on the rail viaduct required to carry the main line across the Avon valley.
Engineers excavated and built underground anchorage structures to resist the future suspension chain loads.
Design work considered a high central suspension span supported by masonry towers and anchored iron chains.
The steamship underwent a programme of alterations intended to provide additional passenger accommodation.
Refitting work in the period from 1839 to 1840 lengthened Great Western and increased her accommodation capacity.
Alterations to Great Western during the 1839 to 1840 period expanded the space available for commercial operations.
The Great Western section between Bristol and Bath opens, using Brunel's broad gauge and associated masonry structures.
Opens his original Bristol Temple Meads terminus.
Trains begin running from Brunel's Bristol station toward Bath.
Daniel Gooch proposes locomotive works at Swindon and Brunel supports creation of a major railway centre there.
Brunel submits a detailed report recommending screw propulsion instead of paddle wheels for the new Great Britain.
Another section of Brunel's Great Western main line opens between Wootton Bassett and Chippenham.
Brunel orders SS Great Britain to be redesigned for screw propulsion instead of paddle wheels.
Brunel studies Francis Pettit Smith's screw-propelled Archimedes during trials and demonstrations at Bristol.
The crossing carries the Great Western Railway through the city.
Designs the skew bridge immediately west of Bath Spa station.
A Brunel-designed accommodation bridge is completed on the Challow to Wootton Bassett section of the Great Western Railway.
Brunel's stone culvert over By Brook is completed as part of the Great Western route through the Box area.
The limestone bridge uses Brunel's characteristic elliptical arch.
The Copperhouse Foundry at Hayle receives the contract to manufacture suspension chains for Brunel's Clifton bridge.
The structure carries Brunel's Great Western route through central Bath.
These dates and descriptions come from the historical_events database. Exact duplicate records have been collapsed. Names are grouped by the country, Name 2 and Name 1 fields; records with missing Name 2 cannot be reliably assigned to an individual biography. Check the underlying sources before formal citation.